The causes of the upper diagonal cracks at the downstream side of the main dam pier of Lushui Hydropower Complex are analyzed using finite element method with ABAQUS. By establishing a 3D model of the downstream side of the main dam 5# pier, including the spillway surface, the pier and the foundation of hoist bents on the pier, the thermal stress was analyzed using ABAQUS. The action of solar temperature is a major cause of the cracks. In addition, a crack treatment scheme for the pier was developed, and emergency measures such as prestressed anchoring, planting reinforcement, and chemical grouting were adopted to effectively control the cracks. The research offers a reference for the treatment of similar engineering defects.
Key words
pier /
crack /
finite element analysis /
ABAQUS /
prestressed anchor /
Lushui Hydropower Complex
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 长江流域办公室施工试验总队.陆水蒲圻水利枢纽工程技术总结(第二册)[R].湖北省赤壁市:长江委陆水试验枢纽管理局,1972.
[2] 邢宝革,陈名媛.有限元法在水利工程中的应用与发展[J].智能城市,2016(6):298-298.
[3] 夏建芳,叶南海. 有限元法原理与ANSYS应用[M]. 北京: 国防工业出版社, 2011.
[4] 张起和.陆水枢纽主坝闸墩裂缝粘钢板加固处理[J].人民长江,2004,35(9):5-6.
[5] 陈明祥,黄本忠,常晓林等.陆水试验水利枢纽主坝闸墩加固[J].大坝安全,2004(6):54-57.
[6] 张俊文,曾曲星,缪 力.陆水水利枢纽升船机牛腿裂缝成因分析及处理方案[J].建筑技术开发,2012(6):43-45.
[7] 杨晓红.水利水电工程预应力锚固施工关键技术分析及阐述[J].水电施工技术,2018(1):47-48.
[8] 徐燕丽.植筋技术施工及质量控制[J].湖北水利水电职业技术学院学报,2019(2):59-62.
[9] 陈彦玉.混凝土坝裂缝灌浆关键技术问题探讨[J].长江科学院院报,2011,28(3):54-58.
[10]黄海龙,龚瑞瑞,覃勇勇.差阻式测缝计在大坝安全监测中的发展和应用[J].环境研究与监测,2011,24(1):10-12.