Crack Analysis and Crack Prevention of Large Lock Head for Water Diversion Project from Yangtze River to Huaihe River during Construction

WANG Jian, QI Yong-feng, GENG Fei

Journal of Changjiang River Scientific Research Institute ›› 2024, Vol. 41 ›› Issue (10) : 189-194.

PDF(1950 KB)
PDF(1950 KB)
Journal of Changjiang River Scientific Research Institute ›› 2024, Vol. 41 ›› Issue (10) : 189-194. DOI: 10.11988/ckyyb.20240002

Crack Analysis and Crack Prevention of Large Lock Head for Water Diversion Project from Yangtze River to Huaihe River during Construction

Author information +
History +

Abstract

Compared to concrete dams, the thin-walled mass concrete structures of ship lock heads and pumping stations are relatively smaller in size. However, their structural forms and stress patterns are more complex, with significant constraints. These structures are constructed using pumped high-performance concrete, which generates more heat and heats up faster during the early stages than regular concrete. As a result, they are more prone to temperature-induced cracks during construction, making crack prevention a significant challenge in quality control. With the upper lock head project at Zongyang shiplock of the Yangtze-to-Huaihe River Diversion Project as a research background, we simulated and assessed the impacts of environment, materials, structure, and temperature control measures by using three-dimensional finite element approach. By analyzing temperature field, stress field, and crack resistance, we developed temperature control measures for the project. Our research identifies some functional areas of the upper lock head structure as more prone to cracking. These areas include the bottom plate, water conveyance gallery, pier wall, mass concrete around the empty box and the hoist room. Implementing a combination of temperature control measures, such as temperature-controlled pouring, water cooling, and surface insulation, with differentiated control strategies, can significantly reduce the risk of cracking. The findings offer valuable reference for crack prevention design in thin-walled structures of the Yangtze-to-Huaihe River Diversion Project.

Key words

thin-wall mass concrete / lock head / three-dimensional finite element / crack resistance safety / cracking risk / crack prevention design / water diversion project from Yangtze River to Huaihe River

Cite this article

Download Citations
WANG Jian , QI Yong-feng , GENG Fei. Crack Analysis and Crack Prevention of Large Lock Head for Water Diversion Project from Yangtze River to Huaihe River during Construction[J]. Journal of Yangtze River Scientific Research Institute. 2024, 41(10): 189-194 https://doi.org/10.11988/ckyyb.20240002

References

[1]
陈冠希, 郭永成. 泵送混凝土关键技术工程实践与应用分析[J]. 建筑结构, 2021, 51(增刊1): 2377-2380.
(CHEN Guan-xi, GUO Yong-cheng. Engineering Practice and Application Analysis of Key Technology of Pumping Concrete[J]. Building Structure, 2021, 51 (Supp.1): 2377-2380. (in Chinese))
[2]
程井, 魏李威, 张玉鑫, 等. 基于水化度的泵送混凝土温升模型及参数反演[J]. 水利水电科技进展, 2021, 41(2): 75-81.
(CHENG Jing, WEI Li-wei, ZHANG Yu-xin, et al. Temperature Rise Model for Pumped Concrete Based on Hydration Degree and Parameter Inversion[J]. Advances in Science and Technology of Water Resources, 2021, 41(2): 75-81. (in Chinese))
[3]
牛志国, 王新. 船闸水工建筑物设计与工程实践[M]. 南京: 东南大学出版社, 2019.
(NIU Zhi-guo, WANG Xin. Design and Engineering Practice of Hydraulic Structures for Ship Lock[M]. Nanjing: Southeast University Press, 2019. (in Chinese))
[4]
夏小迪, 汤建宏. 省水船闸的布置方案与结构设计[J]. 水运工程, 2022(增刊1):124-129, 154.
(XIA Xiao-di, TANG Jian-hong. Layout Scheme and Structure Design of Water-saving Ship Lock[J]. Port & Waterway Engineering, 2022 (Supp.1):124- 129, 154. (in Chinese))
[5]
陈灿明, 郭壮, 等. 闸首空箱顶板裂缝成因分析与加固方案探讨[J]. 水利与建筑工程学报, 2018, 16(5): 157-161.
(CHEN Can-ming, GUO Zhuang, et al. Analysis of Causes of Cracks in the Roof of Lock Head Box and Discussion on Reinforcement Scheme. [J]. Journal of Water Resources and Architectural Engineering, 2018, 16(5): 157-161. (in Chinese))
[6]
郭云, 邱勇, 向敏, 等. 某船闸上闸首底板裂缝产生原因分析及处理[J]. 中国农村水利水电, 2013(1):132-134.
Abstract
某船闸上闸首原底板裂缝的存在,对上闸首闸体稳定产生不利影响,通过对裂缝产生的原因及危害性的分析,制定了处理方案。有效地遏制了裂缝的发育,保证了闸体的结构强度和整体稳定性。
(GUO Yun, QIU Yong, XIANG Min, et al. Cause Analysis and Treatment of Cracks in the Bottom Plate of the Upper Lock of a Ship Lock[J]. China Rural Water and Hydropower, 2013(1):132-134. (in Chinese))
某船闸上闸首原底板裂缝的存在,对上闸首闸体稳定产生不利影响,通过对裂缝产生的原因及危害性的分析,制定了处理方案。有效地遏制了裂缝的发育,保证了闸体的结构强度和整体稳定性。
[7]
沈思朝, 颉志强, 王首豪. 基于数值仿真的水闸温控措施敏感性分析[J]. 长江科学院院报, 2022, 39(1): 146-154.
Abstract
水闸属于薄壁大体积混凝土结构,实践表明,若不采取温控措施,尤其是低温季节施工的混凝土水闸结构在浇筑初期极易出现表面裂缝,后期易扩展为贯穿性裂缝。弄清各温控措施对水闸温度场、应力场及开裂风险的影响,是制定水闸温控指标和防裂措施的前提。以某在建的低温季节浇筑水闸工程为研究对象,利用三维有限元法,计算分析了在低温季节浇筑施工时水闸结构的温度场、应力场特性,重点进行了开裂风险的敏感性分析。结果表明,单一温控措施的防裂效果有限,控温浇筑、表面保温、冷却通水必须相互协调,能有效控制水闸温度应力并避免裂缝产生。
(SHEN Si-chao, XIE Zhi-qiang, WANG Shou-hao. Sensitivity Analysis of Sluice Temperature Control Measures Based on Numerical Simulation[J]. Journal of Yangtze River Scientific Research Institute, 2022, 39(1): 146-154. (in Chinese))
Sluice is a large-volume concrete structure with thin walls. Practice have shown that concrete sluice structure constructed in low-temperature season is subjected to surface cracks in the early stage of pouring if no temperature control measure is taken, and such surface cracks would penetrate through in later stage. To clarify the influence of temperature control measures on the temperature field, stress field and cracking risk of the sluice is the prerequisite of determining temperature control indices and formulating anti-cracking measures. With a sluice project under construction in low-temperature season as a case study, we examined the spatial and temporal characteristics of temperature field and stress field by simulating the construction process using 3D finite element method. On this basis, we analyzed the sensitivities of stress to pouring temperature, surface temperature preservation, and water cooling. Results manifested that single measure has limited effect. Multiple measures including temperature-control pouring, surface temperature preservation, and water cooling must be coordinated to effectively control the temperature stress of the sluice and avoid cracks.
[8]
王凤娥, 陈亚丁, 孟佳阳. 船闸大体积混凝土仿真计算及温控研究[J]. 中国水运(下半月), 2020, 20(6):128-129,217.
(WANG Feng-e, CHEN Ya-ding, MENG Jia-yang. Study on Simulation Calculation and Temperature Control of Mass Concrete in Shiplock[J]. China Water Transport, 2020, 20(6):128- 129, 217. (in Chinese))
[9]
李松辉, 李玥, 孙祥鹏. 水闸混凝土结构关键部位温控防裂研究[J]. 水利水电技术, 2017, 48(12):45-49.
(LI Song-hui, LI Yue, SUN Xiang-peng. Study on Temperature Control and Crack Prevention for Key Positions on Concrete Structure of Sluice[J]. Water Resources and Hydropower Engineering, 2017, 48(12):45-49. (in Chinese))
[10]
苏超, 张思怡, 杨旸. 横拉门船闸闸首施工期混凝土防裂措施研究[J]. 水力发电, 2019, 45(10):64-69.
(SU Chao, ZHANG Si-yi, YANG Yang. Study on Concrete Crack Prevention Measures in the Construction Period of Lock Head with Transverse Pull Door[J]. Water Power, 2019, 45(10): 64-69. (in Chinese))
[11]
李扬. 引江济淮枞阳船闸混凝土配合比试验分析报告[R]. 武汉: 长江科学院, 2019.
(LI Yang. Analysis Report on Concrete Mix Ratio Test of Zongyang Ship lock of the Diversion Project from Yangtze to Huaihe River[R]. Wuhan: Changjiang River Scientific Research Institute, 2019. (in Chinese))
[12]
赵永祥, 刘波, 高玉杰, 等. 预成孔置换强夯法在软土地基中的试验研究[J]. 长江科学院院报, 2022, 39(10):116-120,127.
Abstract
强夯置换法是一种软土地基处理方法,存在置换墩不着底、工后沉降大、施工效率低等缺点。针对强夯置换法的上述缺点,提出了一种新型软土地基处理方法——预成孔置换强夯法。该方法通过将高能级强夯法与预先成孔填料相结合,达到提高地基承载力、减小工后沉降的目的。通过开展试验区(24 m×24 m)试验,在夯后进行平板载荷试验、重型动力触探试验及充水预压试验,验证了该方法的可行性,并最终将该技术成功应用于整个软土地基场地。试验结果表明:夯后动力触探击数提高了260%以上,复合地基承载力达到280 kPa,储罐基础沉降最大值、相邻测点沉降差均远小于规范要求。该方法的成功应用对于今后类似地基的处理具有一定的参考意义。
(ZHAO Yong-xiang, LIU Bo, GAO Yu-jie, et al. Experimental Investigation on Treatment of Soft Soil Foundation by Prebored Dynamic Replacement[J]. Journal of Yangtze River Scientific Research Institute, 2022, 39(10):116- 120, 127. (in Chinese))
Dynamic replacement,as a treatment method for soft soil foundation,has some shortcomings such as the gap between the replacement columns and the basement,large post-construction settlement,and low construction efficiency. In view of this,a dynamic replacement method with prebored filling is proposed to enhance the bearing capacity of foundation and reduce the post-construction settlement by tamping the prebored columns filled with materials under high energy level. The method is verified feasible through plate loading test,heavy dynamic penetration test and water filling and preloading test after tamping,and finally successfully applied to the whole soft soil foundation site. The number of dynamic sounding blows after tamping increased by over 260%,the bearing capacity of composite foundation reached 280 kPa,and the maximum settlement of tank foundation and the settlement difference of adjacent measuring points are far less than the requirements of specification. The successful application of this method serves as reference for the treatment of similar foundation.
[13]
曹邱林, 孟怡凯. 微桩群复合地基水闸闸室结构有限元分析[J]. 人民长江, 2013, 44(4):31-34,47.
(CAO Qiu-lin, MENG Yi-kai. FEM Analysis on Sluice Structure with Composite Foundation of Micro-piles[J]. Yangtze River, 2013, 44(4):31- 34, 47. (in Chinese))
[14]
郭红亮, 石运深, 焦雨佳, 等. 汉江兴隆水利枢纽泄水闸地基处理设计[J]. 人民长江, 2015, 46(15): 26-29.
(GUO Hong-liang, SHI Yun-shen, JIAO Yu-jia, et al. Design of Sluice Foundation Treatment of Xinglong Hydrojunction Project on Hanjiang River[J]. Yangtze River, 2015, 46(15): 26-29. (in Chinese))
[15]
NB/T 35092—2017, 混凝土坝温度控制设计规范[S]. 北京: 中国电力出版社, 2017.
(NB/T 35092—2017, Design Code for Temperature Control of Concrete Dam[S]. BeiJing: China Electric Power Press, 2017. (in Chinese))
PDF(1950 KB)