The Three Gorges Reservoir (TGR) is endowed with many tributaries and large local inflow. The correct calculation of local inflow process is an important issue in the hydrodynamics calculation for the TGR as the amount and process of inflow directly concerns the calculation precision of reservoir regulation and storage. In this article, the daily inflow process in the TGR area is back-calculated on the premise of water balance by a 1-D mathematical unsteady flow model proposed by the author previously. The local inflow process is added to the calculated reach by being distributed to each tributary in correspondence to the proportions of catchment area. The effect of adding local inflow to each reach is analyzed. Results demonstrate that the calculation results of the discharge process of the Three Gorges Reservoir are in good agreement with the measured results after the proposed method is adopted.
Key words
Three Gorges Reservoir /
local inflow /
mathematical model /
back calculation /
unsteady flow
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 彭 杨,张红武. 三峡库区非恒定一维水沙数值模拟. 水动力学研究与进展(A辑), 2006, 21(3):285-292.
[2]董年虎,方春明,曹文洪. 三峡水库不平衡泥沙输移规律. 水利学报, 2010, 41(6): 653-658.
[3]方春明. 三峡水库水流泥沙数学模型改进与冲淤计算研究专题报告. 北京:中国水利水电科学研究院,2015.
[4]周建军. 三峡水库泥沙淤积计算成果. 北京:清华大学,2007.
[5]赵瑾琼. 梯级水库泥沙淤积规律及调度技术初步研究.武汉: 武汉大学, 2011.
[6]黄仁勇,黄 悦. 三峡水库干支流河道一维非恒定水沙数学模型初步研究 . 长江科学院院报,2009, 26(2): 9-13.
[7]黄仁勇,李 飞,张细兵. 三峡水库运用初期库区水沙输移数值模拟 . 长江科学院院报,2012, 29(1): 7-12.