Efficiency of Seepage Control of Cut-off Wall in Building’s Foundation Pit

ZHANG Jia-fa , FAN Shi-kai , TAO Hong-liang ,WU Qing-hua

Journal of Changjiang River Scientific Research Institute ›› 2016, Vol. 33 ›› Issue (6) : 58-64.

PDF(1408 KB)
PDF(1408 KB)
Journal of Changjiang River Scientific Research Institute ›› 2016, Vol. 33 ›› Issue (6) : 58-64. DOI: 10.11988/ckyyb.20150490
ROCK-SOIL ENGINEERING

Efficiency of Seepage Control of Cut-off Wall in Building’s Foundation Pit

  • ZHANG Jia-fa1,2, FAN Shi-kai3, TAO Hong-liang3,WU Qing-hua1,2
Author information +
History +

Abstract

Cut-off wall is widely used to control the seepage field for building’s foundation pit, but the efficiency of cut-off wall is not known very well. In the background of the common foundation of double layers in Wuhan of China, a model was set up for the seepage field around a typical building foundation pit. Through numerical simulation, the law of seepage field control for cut-off wall was revealed. Then the application of cut-off wall was discussed on the basis of the study results and engineering practices. It is pointed out that cut-off wall of closure type could control seepage field efficiently under the conditions that the cut-off wall is prevented from any defect and is extended into reliable stratum with low permeability. The seepage control efficiency can be promoted to limited extent for the cut-off wall of suspension type with higher penetration rate which should be set reasonably with the cost, duration, water discharge and safety being taken into account. An efficient seepage field control system must be formed by coordinating cut-off wall and drainage measures. The seepage field control system for a building foundation pit should be designed in consideration of adjacent buildings, flood control projects and other facilities in addition to geological and hydrological conditions. Then we can achieve the safety of foundation pit and control its adverse effect on environment. These conclusions are referential for the foundation pit of public works including metro engineering.

Key words

safety of foundation pit / cut-off wall / penetration rate / hydraulic gradient / seepage field control / numerical simulation

Cite this article

Download Citations
ZHANG Jia-fa , FAN Shi-kai , TAO Hong-liang ,WU Qing-hua. Efficiency of Seepage Control of Cut-off Wall in Building’s Foundation Pit[J]. Journal of Changjiang River Scientific Research Institute. 2016, 33(6): 58-64 https://doi.org/10.11988/ckyyb.20150490

References

[1] 范士凯.论不同地质条件下深基坑的变形破坏类型、主要岩土工程问题及其支护设计对策[J]. 资源环境与工程,2006,(增1):645-655.
[2] 张家发,吴昌瑜,李胜常,等. 堤防加固工程中防渗墙的防渗效果及应用条件研究[J].长江科学院院报,2001,(5):56-60.
[3] 丛蔼森.多层地基深基坑的渗流稳定问题探讨[J]. 岩石力学与工程学报,2009,(10):2018-2023.
[4] 高 健,粟玉英,孟照蔚,等. 汉口Ⅰ级阶地3-5互层特性及对地铁工程的影响[J]. 资源环境与工程, 2013,(4):592-595.
[5] 范士凯,杨育文.长江一级阶地基坑地下水控制方法和实践[J]. 岩土工程学报,2010,(7):63-68.
[6] 水利部长江水利委员会. 长江重要堤防隐蔽工程地图集[M].北京:科学出版社, 2004.
[7] 张家发,林水生,吴德绪,等. 论土石围堰和基坑渗流场调控[J]. 长江科学院院报,2013,(2):20-26.
[8] 张家发,吴昌瑜,朱国胜. 堤基渗透变形扩展过程及悬挂式防渗墙控制作用的试验模拟[J]. 水利学报,2002,(9):108-111.
[9] 张家发,朱国胜,曹敦侣. 堤基渗透变形扩展过程和悬挂式防渗墙控制作用的数值模拟研究[J]. 长江科学院院报, 2004,(6):47-50.
[10]丁留谦, 姚秋玲, 孙东亚, 等. 双层地基中悬挂式防渗墙渗控效果的试验研究[J]. 水利水电技术, 2007, 38(2):23-26.
[11]张 挺,曹 洪,詹杰民,等.北江大堤石角堤段防渗工程效果分析[J]. 岩石力学与工程学报,2009,(11):2235-2241.
[12]徐杨青,刘国锋,盛永清.深基坑嵌岩地下连续墙隔渗效果分析与评价方法研究[J].岩土力学,2013,(10):2905-2910.
PDF(1408 KB)

Accesses

Citation

Detail

Sections
Recommended

/