Preliminary Study on Dynamic Operation Mode of “Storing Clear Water and Releasing Muddy Water” in the Three Gorges Reservoir in Flood Season

HUANG Ren-yong, WANG Min, ZHANG Xi-bing, LIU Liang, REN Shi, ZHOU Man

Journal of Changjiang River Scientific Research Institute ›› 2018, Vol. 35 ›› Issue (7) : 9-13.

PDF(1458 KB)
PDF(1458 KB)
Journal of Changjiang River Scientific Research Institute ›› 2018, Vol. 35 ›› Issue (7) : 9-13. DOI: 10.11988/ckyyb.20170107
RIVERLAKE SEDIMENTATION AND REGULATION

Preliminary Study on Dynamic Operation Mode of “Storing Clear Water and Releasing Muddy Water” in the Three Gorges Reservoir in Flood Season

  • HUANG Ren-yong1, WANG Min1, ZHANG Xi-bing1, LIU Liang2, REN Shi2, ZHOU Man2
Author information +
History +

Abstract

In an attempt to optimize the dispatching mode of the Three Gorges Reservoir (TGR) in flood season, we analyzed the variations of inbound and outbound sediment discharge after the impoundment of TGR based on measured data, and preliminarily investigated into the dynamic operation mode of “storing clear water and releasing muddy water” in flood season in terms of sediment. Since the impoundment of TGR, inbound sediment discharge has reduced by a large margin in flood season; in particular, since the operation of Xiluodu reservoir and Xiangjiaba reservoir, sediment concentration in TGR in flood season (June to September) has been smaller than those in May and October of demonstration stage. Meanwhile, accounting for over 90% of the annual value, sediment outflow in main flood season mainly concentrated in one or two large sand peaks. In the near future, the dynamic operation mode of “storing clear water and releasing muddy water” in flood season allows for sediment deposition.

Key words

Three Gorges Reservoir / operation mnode in flood season / storing clear water and releasing muddy water / dynamic operation / sedimentation

Cite this article

Download Citations
HUANG Ren-yong, WANG Min, ZHANG Xi-bing, LIU Liang, REN Shi, ZHOU Man. Preliminary Study on Dynamic Operation Mode of “Storing Clear Water and Releasing Muddy Water” in the Three Gorges Reservoir in Flood Season[J]. Journal of Changjiang River Scientific Research Institute. 2018, 35(7): 9-13 https://doi.org/10.11988/ckyyb.20170107

References

[1] 水利部长江水利委员会.长江三峡水利枢纽初步设计报告[R].武汉:水利部长江水利委员会,1992.
[2] 黄仁勇,张细兵.三峡水库运用前后进出库水沙变化分析[J].长江科学院院报,2011,28(9):75-79.
[3] 许全喜.三峡水库蓄水以来水库淤积和坝下冲刷研究[J]. 人民长江,2012,43(7): 1-6.
[4] 袁 晶,许全喜,童 辉.三峡水库蓄水运用以来库区泥沙淤积特性研究[J].水力发电学报,2013,32(2): 139-174.
[5] 董炳江,乔 伟,许全喜.三峡水库汛期沙峰排沙调度研究与初步实践[J].人民长江,2014,45(3): 7-11.
[6] 胡 挺,王 海,胡兴娥,等.三峡水库近十年调度方式控制运用分析[J].人民长江,2014,45(9): 24-29.
[7] 周 曼,徐 涛.三峡水利枢纽多目标优化调度及其综合效益分析[J].水力发电学报,2014,33(3): 55-60.
[8] 长江水利委员会水文局.2015年度三峡水库进出库水沙特性、水库淤积及坝下游河道冲刷分析[R].武汉:长江水利委员会水文局,2016.
[9] 水利部长江水利委员会.三峡水库优化调度方案研究[R]. 武汉:水利部长江水利委员会,2009.
[10]中国长江三峡集团公司,中国水利水电科学研究院,长江勘测规划设计研究有限责任公司.三峡水库泥沙调控与多目标优化调度课题研究报告[R].宜昌:中国长江三峡集团公司,2015.
[11]中国水利学会泥沙专业委员会.泥沙手册[M].北京:中国环境科学出版社,1992.
[12]韩其为.水库淤积[M].北京:科学出版社,2003.
[13]涂启华,杨赉斐.泥沙设计手册[M].北京:中国水利水电出版社,2006.
[14]朱鉴远.水利水电工程泥沙设计[M].北京:中国水利水电出版社,2010.
[15]潘庆燊,陈济生,黄 悦,等.三峡工程泥沙问题研究进展[M].北京:中国水利水电出版社,2014.
[16]潘庆燊.长江水利枢纽工程泥沙研究[M].北京:中国水利水电出版社,2003.
PDF(1458 KB)

Accesses

Citation

Detail

Sections
Recommended

/