Journal of Changjiang River Scientific Research Institute ›› 2021, Vol. 38 ›› Issue (6): 1-8.DOI: 10.11988/ckyyb.20201133

• SPECIAL CONTRIBUTIO • Previous Articles     Next Articles

Major Hydraulics Problems of Wudongde Hydropower Station

HUANG Guo-bing1,2, WU Shuang1   

  1. 1. Hydraulics Department, Yangtze River Scientific Research Institute, Wuhan 430010, China;
    2. Key Laboratory of River Regulation and Flood Control in Middle and Downstream Yangtze River of Ministry of Water Resources, Yangtze River Scientific Research Institute, Wuhan 430010, China
  • Received:2020-11-05 Revised:2021-01-19 Published:2021-06-01 Online:2021-06-01

Abstract: The Wudongde Hydropower Station features narrow valley, steep bank slope, large flood discharge, high water head and deep riverbed covering. The layout of flood discharge building is subject to great limitations due to gullies developed at the dam site, giving rise to prominent hydraulic problems which pose daunting technical challenges to engineering design and construction. In this paper we expound the major research achievements in tackling the hydraulic problems via scale model test and numerical analysis. Such problems include: layout of the project, flood discharge and energy dissipation, flood discharge atomization, river diversion and closure, and multi-level water intake. The research achievements provide scientific and technological support for engineering design.

Key words: hydraulics, Wudongde Hydropower Station, flood energy dissipation, flood atomization, river diversion and closure, multi-level water intake