[1] |
PEI Shu-feng, HAO Wen-feng, FAN Yi-lin, CHEN Hao, LI Wen-tao.
Operation Condition of Anchoring System in Large-scale Water Conservancy and Hydropower Projects
[J]. Journal of Changjiang River Scientific Research Institute, 2024, 41(2): 142-150.
|
[2] |
FENG Chuan-yong, ZHANG Zhen-jun, ZHENG Ya-hui.
Research and Development of a Real Time Water Line Surveying and Mapping System
[J]. Journal of Changjiang River Scientific Research Institute, 2021, 38(11): 162-166.
|
[3] |
WU Xin-xia, HU Ying-guo, LIU Mei-shan, ZHAO Gen, YANG Zhao-wei.
Research Progress of Blasting Technology in Hydropower Engineering
[J]. Journal of Changjiang River Scientific Research Institute, 2021, 38(10): 112-120.
|
[4] |
WANG Tian-xing, ZHANG Ji-xun, REN Xu-hua, ZHANG Yu-xian.
BIM-based Simulation on Construction Progress of Hydraulic Tunnel
[J]. Journal of Changjiang River Scientific Research Institute, 2020, 37(11): 149-155.
|
[5] |
LIN Wei.
BIM-based Visualization and Application Demonstration of Sci-Tech Achievements in Hydropower Engineering
[J]. Journal of Changjiang River Scientific Research Institute, 2016, 33(8): 134-137.
|
[6] |
SHEN Song-yong, LI Zhe, JI Qing-hui,CHEN Xi-chi.
Design and Implementation of Construction Management InformationSystem for North Hubei Water Transfer Project
[J]. Journal of Changjiang River Scientific Research Institute, 2016, 33(11): 68-72.
|
[7] |
TIAN Xiong,ZHANG Shi-shu,LI Chang-you,YUAN Guo-qing.
Comprehensive Scoring Method for Evaluating the Stability ofPotentiallly Hazardous Rock Masses of Surrounding Slopesin Hydropower Projects
[J]. Journal of Changjiang River Scientific Research Institute, 2016, 33(1): 38-42.
|
[8] |
GUO Hai-qing, ZHANG Min, HUANG Tao, AI Chun-bin.
Prediction Model for Rock-Soil Slope Based on Time Shift Wavelet and Grey Theory
[J]. Journal of Changjiang River Scientific Research Institute, 2015, 32(9): 146-152.
|
[9] |
FAN Xin-yu, LUO Xue-dong, LI Jin-wei, LI Xuan, MEI Nian-feng.
Sensibility Analysis on the Influence Factors on High-Steep Mine Slope Stability in Cold Region
[J]. Journal of Changjiang River Scientific Research Institute, 2015, 32(9): 58-62.
|
[10] |
WAN Yun-hui, LI Xiao-shuai, QIAN Fu-yun.
Application of 3D Collaborative Design in Hydroprojects
[J]. Journal of Changjiang River Scientific Research Institute, 2015, 32(7): 137-142.
|
[11] |
ZHOU Li-ming, XIAO Guo-qiang, WANG Fa-gang, FU Dai-guang.
Rock Mass Weathering and Unloading Characteristics: Case Study on the High and Steep Slope of Yaojiaping Hydropower Project
[J]. Journal of Changjiang River Scientific Research Institute, 2014, 31(11): 81-86.
|
[12] |
LI Zhe1,TAN De-bao1,ZHANG Sui1,WANG Rong-ping2,WANG Xiao-bin2.
Design and Development of Management Information System for Water Project Construction
[J]. Journal of Changjiang River Scientific Research Institute, 2014, 31(1): 66-71.
|
[13] |
YU Xue-nong, WANG Lu, RAO Xiao-kang.
Application of Digital Construction Management System to Dagangshan Hydropower Station
[J]. Journal of Changjiang River Scientific Research Institute, 2013, 30(4): 98-102.
|
[14] |
WANG Ren-chao,CAO Yong-lei.
Application of BIM to Construction InformationManagement for Concrete Dam
[J]. Journal of Changjiang River Scientific Research Institute, 2013, 30(12): 118-121.
|
[15] |
WANG Huai-Ming, YANG Min.
Uplift Force Distribution on Plunge Pool Slab: Coalition Discharge from Surface and Bottom Outlets of High Dam
[J]. Journal of Changjiang River Scientific Research Institute, 2012, 29(7): 53-56.
|