BIM-based Simulation on Construction Progress of Hydraulic Tunnel

WANG Tian-xing, ZHANG Ji-xun, REN Xu-hua, ZHANG Yu-xian

Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (11) : 149-155.

PDF(4055 KB)
PDF(4055 KB)
Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (11) : 149-155. DOI: 10.11988/ckyyb.20190946
INFORMATION TECHNOLOGY APPLICATION

BIM-based Simulation on Construction Progress of Hydraulic Tunnel

  • WANG Tian-xing1, ZHANG Ji-xun2, REN Xu-hua2, ZHANG Yu-xian2
Author information +
History +

Abstract

Current numerical models of simulating the construction process of hydraulic tunnel perform incompletely as they are not integrated with 3D software thoroughly. In view of this, the theory and 4D technology of simulating hydraulic tunnel construction progress are studied based on BIM technology. Firstly, a 3D parametric model of hydraulic tunnel is established using CATIA, and then a simulation model for hydraulic tunnel construction is established in line with the construction characteristics and simulation principles. Finally, the 4D framework of simulating hydraulic tunnel construction is proposed. The construction progress can be inquired and the construction information can be displayed through the model. Practice has proved that the BIM-based simulation model could offer construction progress calculation and construction intensity query, thus improving management in the construction process.

Key words

hydraulic tunnel / construction management / BIM / simulation calculation / construction progress

Cite this article

Download Citations
WANG Tian-xing, ZHANG Ji-xun, REN Xu-hua, ZHANG Yu-xian. BIM-based Simulation on Construction Progress of Hydraulic Tunnel[J]. Journal of Changjiang River Scientific Research Institute. 2020, 37(11): 149-155 https://doi.org/10.11988/ckyyb.20190946

References

[1] LIN C T, HSIE M, HSIAO W T, et al. Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation[J]. Journal of Performance of Constructed Facilities, 2012, 26(2), doi: 10.1061/(ASCE)CF.1943-5509.0000219.
[2] 中华人民共和国住房和城乡建设部. 2016—2020年建筑业信息化发展纲要 [J]. 建筑安全, 2017, 32(1): 4-7.
[3] 曾 越,朱黎明,杨志木,等.BIM在马普托大桥钢箱梁专项施工方案的应用[J].公路交通科技,2018, 35(增刊1):73-78.
[4] 李海涛.基于BIM的建筑工程施工安全管理研究[D].郑州:郑州大学, 2014.
[5] 任步耀. BIM技术在工程施工管理中的重要性[J].公路交通科技(应用技术版), 2018, 159(3):310-312.
[6] 廖思博.基于BIM的地下工程穿越既有结构安全风险预警研究 [D].西安:西安建筑科技大学, 2016.
[7] HALPIN D W. CYCLONE-method for Modeling Job Site Processes[J]. Journal of the Construction Division, ASCE, 1977, 103: 489-499.
[8] HUANG R Y, GRIGORIADIS A M, HALPIN D W. Simulation of cable-stayed bridges using disco[C]//Proceedings of the Winter Simulation Conference. Institute of Electrical and Electronics Engineers (IEEE). Florida, December 11-14, 1994.
[9] WANG H J, ZHANG J P, CHAU K W, et al. 4D Dynamic Management for Construction Planning and Resource Utilization[J]. Automation in Construction, 2004, 13(5):575-589.
[10]钟登华.隧洞循环施工过程模拟研究 [D]. 天津:天津大学,1987.
[11]毕 磊.基于不确定性分析的地下洞室群施工进度仿真分析与优化研究 [D]. 天津:天津大学, 2015.
[12]王仁超,李世鹏,徐跃明,等.抽水蓄能电站开挖施工仿真研究[J]. 水力发电学报, 2018, 37(3):18-27.
[13]黄建文,李朝全,刘凯丽,等.地下洞室开挖施工进度系统动力学仿真模型 [J]. 土木工程与管理学报, 2018, 35(2): 82-88.
[14]钟登华,林瀚文,吴斌平,等.基于M5P-SVR故障预测的地下洞室施工仿真[J].水力发电学报,2019, 38(4):201-214.
[15]董甲甲,杨 磊,杜燕林.基于CATIA的重力坝可视化设计 [J]. 水利水电科技进展, 2010, 30(5): 57-60.
[16]康凤举.现代仿真技术与应用[M].北京:国防工业出版社, 2006.
[17]谢行皓.建筑工程系统仿真[M].北京:科学出版社, 2001.
[18]MOELLER G L, DIGMAN L A. Operations planning with VERT [J]. Operations Research, 1981, 29(4): 676.
[19]李 珊.关键路线法(CPM)[J]. 系统工程与电子技术, 1979(1):84-85.
[20]钟登华,孙锡衡.循环网络模拟技术[J].系统工程理论与实践, 1994, 14(2): 7-12.
[21]林 伟.基于BIM的水电工程科技成果可视化与应用示范[J].长江科学院院报, 2016, 33(8): 134-137.
[22]王仁超,曹永雷.BIM在混凝土坝工程施工信息管理中的应用[J].长江科学院院报, 2013, 30(12): 118-121.
PDF(4055 KB)

Accesses

Citation

Detail

Sections
Recommended

/