JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2011, Vol. 28 ›› Issue (12): 68-71.

• JOINT OPERATION OF RESERVOIR GROUP • Previous Articles     Next Articles

Impoundment in Advance at the End of Flood Season for Danjiangkou Reservoir

 HUO  Jun-Jun, XU  Ji-Jun, ZHANG  Li-Li   

  1. Water Resources Department, Yangtze River Scientific Research Institute
  • Received:2010-11-10 Online:2011-12-01 Published:2011-12-05

Abstract: An important water source of South-to-North Water Diversion Project, Danjiangkou Reservoir is less frequently impounded to full capacity at the end of flood season because of the increasing water use in Hanjiang River Basin. Based on the regularity in the occurrence time of the last flood each year in Danjiangkou Reservoir, a scheme of reservoir impoundment in late September instead of early October is proposed. Flood control safety analysis suggests that the new scheme could maintain the original flood control standard without increasing any flood risk. Moreover, the new scheme is proved to be more economically beneficial than the original one through comparisons on the basis of the actual inflow data of Danjiangkou Reservoir.

Key words: Danjiangkou Reservoir, impoundment in advance, flood resources utilization

CLC Number: