As the water source of the middle route of South-to-North Water Transfer Project, Danjiangkou Reservoir boasts an ever-increasingly prominent function of water supply and other benefits after the dam was heightened. Nevertheless, the decline in rainfall and the regulation and storage of cascade reservoirs in the upper reaches of Hanjiang River have greatly reduced the transferable water resources of Danjiangkou Reservoir. In order to give full play to the benefit of the reservoir, we calculated and analyzed the influences of the starting and regulating water level, the uncertainty of incoming water and the limited water level of flood season on the benefit of Danjiangkou Reservoir from three aspects: water supply satisfaction rate, average annual electricity generation and average annual waste water level. Results manifested that 1) water level at the incipience of regulation has a great influence on the water supply benefit in dry year when the frequency of incoming water is more than 90%. When water level is raised from 150 m to 160 m, the rate of meeting water supply demand can be increased from 44.38% to 93.42%. When the frequency of incoming water is less than 75.7%, water level mainly affects power generation. The higher the water level at the incipience of regulation is, the higher the annual power generation is, and the smaller the annual waste water is. When water level is raised from 150 m to 170 m, power generation could increase by at least 1 billion kW·h. 2) The higher the frequency of incoming water, the smaller the rate of meeting water supply demand, and the lower the average annual power generation. When incoming water is abundant, water abandon and water supply shortage both exist in the mean time. 3) The influence of flood limit water level in summer on the benefit of Danjiangkou Reservoir is more significant than that of flood limit water level in autumn; in a three-year regulation period with at least two years of low water, flood limited water level exerts a most obvious influence on abandoned water quantity. 4) Water level at the incipience of regulation is the major factor that affects the operation benefit of the reservoir. Except from continuous dry years, the water supply demand of different level years can be met if the water level at the incipience of regulation is 162 m.
Key words
reservoir water supply /
utilization benefit /
water level at the incipience of regulation /
flood limit water level /
incoming water frequency /
Danjiangkou Reservoir /
water source of South-to-North Water Transfer Project
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 张爱静, 姚文锋, 吴智健. 丹江口水库入库径流变化特征分析[J]. 人民长江, 2020, 51(3):81-86,93.
[2] 张婉蕾, 胡铁松. 丹江口水库提前蓄水的二层规划模型[J]. 水电与新能源, 2018, 32(3):5-9,17.
[3] 霍军军, 许继军, 张莉莉. 丹江口水库汛末提前蓄水策略探讨[J]. 长江科学院院报, 2011, 28(12):68-71.
[4] 汪 芸,郭生练,李天元.丹江口水库提前蓄水方案[J].武汉大学学报(工学版),2014,47(4):433-439.
[5] 汪 芸, 郭家力, 郭生练,等. 丹江口水库长期兴利调度的不确定性分析[J]. 水力发电, 2016, 42(7):97-102.
[6] 张 俊, 闵要武, 段唯鑫. 丹江口水库汛期水位动态控制关键技术研究与实践[J]. 长江技术经济, 2019, 3(2):81-90.
[7] 张莉莉, 许继军, 霍军军,等. 丹江口水库汛限水位分期控制初步探讨[J]. 长江科学院院报, 2009,26(3): 13-16,31.
[8] 刘子慧,吴泽宇. 改善丹江口水库防洪限制线探讨[J]. 人民长江,2001, 32(9):18-20.
[9] 王 俊, 郭生练. 三峡水库汛期控制水位及运用条件[J]. 水科学进展, 2020,31(4):473-480.
[10] 李 响,郭生练,刘 攀,等. 三峡水库汛期水位控制运用方案研究[J].水力发电学报,2010,29(2):102-107.
[11] 覃 晖, 李清清, 周建中. 基于相对优势度的水库防洪调度多属性风险决策方法研究[J]. 长江科学院院报, 2011,28(12):58-63.
[12] 王若晨, 欧阳硕. 调水背景下丹江口水库优化调度与效益分析[J]. 长江科学院院报, 2016, 33(12):17-17.
[13] 左 建, 陆宝宏, 顾 磊,等. 基于综合调度的三峡水库汛末蓄水研究[J]. 水力发电, 2015, 41(12):85-88.
[14] 刘心愿, 朱勇辉, 郭小虎,等. 水库多目标优化调度技术比较研究[J]. 长江科学院院报, 2015, 32(7):9-14.
[15] 高雪山, 刘树锋, 关 帅,等. 基于生态流量保障的水库综合调度方案编制及应用[J]. 长江科学院院报,2021,38( 4) : 19-24.
[16] 王 成, 曹庆磊. 水库运行管理中优化调度的计算机算法研究[J]. 长江科学院院报, 2011, 28(1):66-70.
[17] 周 婷、戚王月、金菊良. 水库群优化调度中的结构分析方法研究进展[J]. 长江科学院院报, 2020,37(12):18-25,31.
[18] 李荣波, 纪昌明, 孙 平,等. 基于改进混合蛙跳算法的梯级水库优化调度[J]. 长江科学院院报, 2018, 35(6):30-35.
[19] 郭生练,尹家波,李 丹,等.丹江口水库设计洪水复核及偏大原因分析[J].水力发电学报,2017,36(2):1-8.