JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2017, Vol. 34 ›› Issue (7): 126-131.DOI: 10.11988/ckyyb.20160266

• INFORMATION TECHNOLOGY APPLICATION • Previous Articles     Next Articles

Design and Implementation of Scheduling Management System for Water Diversion Project in East Zhejiang Province

SONG Li-song, YU Huan-fei, YAO Yun   

  1. Zhejiang Institute of Hydraulics and Estuary, Hangzhou 310020,China
  • Received:2016-03-25 Online:2017-07-01 Published:2017-07-10

Abstract: The water diversion project in the east of Zhejiang province is featured with long route and complex operation management. In order to guarantee the safe and stable running and benefits of the project, we designed and developed a management system for the scheduling of the diversion project based on geological information system (GIS). The system has functions inclusive of information monitoring and management, scheduling management, project management, and administrative services. Network technology and database technology were employed for gathering and analyzing real-time monitoring information along the route. Methods of yearly superposition forecasting and dynamic correction were put forward based on time series analysis, and the workflow of scheduling was designed. The system has run stably and played a good role in the water diversion project.

Key words: water diversion project in East Zhejiang, scheduling management, information system, real time monitoring, water resources

CLC Number: