长江科学院院报 ›› 2012, Vol. 29 ›› Issue (8): 93-99.DOI: 10.3969/j.issn.1001-5485.2012.08.018

• 岩石力学与工程试验及测试技术专辑 • 上一篇    下一篇

土石围堰分期拆除过程中的边坡稳定性分析

汪洋,吴新霞,尹健民,吴从清,周黎明,艾凯   

  1. 长江科学院 水利部岩土力学与工程重点实验室,武汉 430010
  • 收稿日期:2012-03-31 修回日期:2012-04-15 出版日期:2012-08-01 发布日期:2012-08-22
  • 作者简介:汪洋(1979-),男,湖南桃江人,博士,高级工程师,主要从事岩石力学与地下工程稳定性等方面的研究
  • 基金资助:

    国家重点基础研究发展计划(973)项目(2011CB710603);中央级公益性科研院所基金项目(CKSF2011020);中央级公益性科研院所基金项目(CKSF2012019)

Slope Stability of Earth-Rock Cofferdam During Phased Demolition

WANG Yang, WU Xin-xia, YIN Jian-min, WU Cong-qing, ZHOU Li-ming, AI Kai   

  1. Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources, Yangtze River Scientific Research Institute, Wuhan 430010, China
  • Received:2012-03-31 Revised:2012-04-15 Online:2012-08-01 Published:2012-08-22

摘要: 为了确保爆区附近已建成的各种水工建筑物的安全以及降低爆破难度和工作量,围堰爆破拆除通常采用分期分区的方式进行。针对赞比亚卡里巴北岸水电站扩机工程进水口围堰分期拆除工程,采用三维有限差分方法结合强度折减法和拟静力法,分别对进水口围堰在削薄后造孔损伤前、削薄过程中受爆破荷载作用、造孔损伤后3种情形下的稳定性进行了综合分析,以确保围堰边坡在分期拆除过程中的整体稳定性,并论证分期拆除方案的可行性。数值计算结果表明:围堰背水面边坡削薄处理过程对围堰和背水面边坡的影响是局部的,对围堰背水面边坡的整体稳定性没有产生较大的影响,表明分期拆除方案是安全、合理的。

关键词: 土石围堰, 拆除, 爆破荷载, 数值模拟, 稳定性

Abstract: Blasting demolition of cofferdam is usually carried out by stages and areas to ensure the safety of hydraulic structures near the blasting zone and to reduce the difficulty of blasting and the workload. To secure the global stability of cofferdam slope during phased demolition, and to prove the feasibility of the phased demolition scheme, we analyzed the stabilities of intake cofferdam in three cases: after being thinned and before borehole drilling damage, during thinning process under blasting loads, and after borehole drilling damage. The phased demolition project for the intake cofferdam of extension project of north bank of Kariba hydropower station in Zambia is taken as a case study. Three-dimensional finite-difference method in association with strength reduction method and pseudo-static method were adopted. The results of numerical simulation showed that the safety factor of cofferdam slope was 1.43 after being thinned and before borehole drilling damage, 1.39 during thinning process under blasting loads, and 1.32 after borehole drilling damage, all met the requirements of standard. These results reveal that the effects of thinning process on the cofferdam and the cofferdam slope on land side are only local, with no serious impact, indicating that the phased demolition scheme is safe and rational.

Key words: earth-rock cofferdam, demolition, blasting load, numerical simulation, stability

中图分类号: