JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2006, Vol. 23 ›› Issue (6): 68-71.
• . • Previous Articles Next Articles
JIANG Cong-Feng, ZHAO Ying-Hui
Online:
Published:
Abstract: Total excavation volume of Shuibuya Project exceeds 20 million cubic meters and total filling volume of the dam is more than 15.60 million cubic meters. Its whole process and technic-economic benefit are considerably influenced by the earth-rock volumes allocation problem. Through analyzing the features of earth-rock volumes allocation of Shuibuya Project, an intelligent earth-rock volume allocation system was developed to model earth-rock allocation in construction. The results of computer simulation are technically feasible and better than those of traditional ways, and the response time of the database system is about 0.5-1.0 second.
JIANG Cong-Feng, ZHAO Ying-Hui. Research on Intelligent Earth-rock Volume Allocation System for Shuibuya Concrete Face Rockfill Dam[J]. JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI, 2006, 23(6): 68-71.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckyyb.crsri.cn/EN/
http://ckyyb.crsri.cn/EN/Y2006/V23/I6/68