Design and Implementation of Construction Management InformationSystem for North Hubei Water Transfer Project

SHEN Song-yong1, LI Zhe1, JI Qing-hui2,CHEN Xi-chi1   

  1. 1.Spatial Information Technology Application Department, Yangtze River Scientific Research Institute, Wuhan430010, China;2.Construction and Management Bureau of Water Resources Allocation Project inNorthern Hubei Province (Planning), Wuhan 430071, China
  • Received:2016-07-20 Published:2016-11-20 Online:2016-11-20

Abstract:

The North Hubei Water Transfer Project is the biggest water resource project in Hubei Province. It has problems inclusive of big investment,limited construction period,long water conveyance line,complex engineering process,many construction units involved,and uneven personnel quality.In view of this,according to technical specifications for hydro-project construction management issued by the Ministry of water resources and several internal management documents issued by the Administration of the North Hubei Water Transfer Project such as Infrastructure construction management measures for the North Hubei Water Transfer Project, we designed and implemented the information system for the construction management of North Hubei Water Transfer Project with the combination of Microsoft C# and Microsoft SQL Server 2012 program languages. The system has already been used for trial in Danjiangkou-Xiangyang construction management branch, Zaoyang-Suizhou branch, and Guangshui-Dawu branch for three months. Results show that with the aid of the system, the complex hierarchical management of multi-type users is improved, the information reporting process is standardized, the efficiency of infrastructure statistics construction is enhanced, and the engineering construction process scenario is better displayed. The work flow is standardized, transparent, and can be traced, which suggests that the information level of the North Hubei Water Transfer Project is improved remarkably.

Key words: water resources allocation, construction management information system, North Hubei Province, statistical reporting and summary of infrastructure construction, 3D visualization