JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2014, Vol. 31 ›› Issue (2): 98-107.DOI: 10.3969/j.issn.1001-5485.2014.02.020

• MONOGRAPH ON THE SYMPOSIUM OF RIVERLAKE EVOLUTION AND REGULATIONIN MIDDLE YANGTZE RIVER 10 YEARS AFTER THREE GORGES PROJECT OPERATION • Previous Articles     Next Articles

Issues on Evolution and Regulation of Yangtze River and Lakes Downstream of TGP

LU Jin-you1,3, ZHU Yong-hui2,3   

  1. 1.Administration Office, Yangtze River Scientific Research Institute, Wuhan 430010,China
    ;2.River Department, Yangtze River Scientific Research Institute, Wuhan 430010,China;3. Key Laboratory of River Regulation and Flood Control of MWR,Yangtze River Scientific Research Institute, Wuhan 430010, China
  • Received:2013-10-29 Revised:2014-01-27 Online:2014-01-26 Published:2014-01-27

Abstract: It’s been 10 years since the Three Gorges Project (TGP) began to operate in June 2003. The hydrological regime, the channel erosion/deposition, and the river-lake relationship in the river downstream of the project has been changing. The variations of flow and sediment transport, erosion/deposition in the mainstream of middle Yangtze River and in the three flow diversion channels, river regime in the mainstream of middle Yangtze River, as well as river-lake relationship are briefly analyzed. The river-lake evolution in the middle Yangtze River predicted by the Changjiang (Yangtze) River Scientific Research Institute (CRSRI) via physical model tests and mathematical modeling are introduced. Comparison between the model predictions and prototype observations are presented. On this basis, the evolution and regulations of rivers and lakes after the joint operation of reservoirs in the upstream Yangtze River are further discussed. The results provide reference for the strategy, formulation and implementation of regulation measures for rivers and lakes.

CLC Number: