Construction Techniques of Water Curtain Hole of an Underground Water-sealed Cavern

ZHOU Yong-li1,SUN Hai-jiang1,2

Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (1) : 114-118.

PDF(5003 KB)
PDF(5003 KB)
Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (1) : 114-118. DOI: 10.3969/j.issn.1001-5485.2014.01.0232014,31(01):114-120
Orignal Article

Construction Techniques of Water Curtain Hole of an Underground Water-sealed Cavern

  • ZHOU Yong-li1,SUN Hai-jiang1,2
Author information +
History +

Abstract

The technical requirements of water curtain hole drilling are expounded in this paper. An underground water-sealed cavern with long water-curtain holes and difficult hole drilling quality control is taken as a case study. By analyzing the drilling angle,drilling speed control,bottom deviation of horizontal holes of different lengths,we obtained the factors affecting the drilling accuracy. Meanwhile,we summarized the procedures of water injection test,and the techniques of water decline test,validity checking test as well as water injection during construction.

Key words

water curtain hole / horizontal long-hole drilling / construction technique / water injection test / quality control

Cite this article

Download Citations
ZHOU Yong-li1,SUN Hai-jiang1,2. Construction Techniques of Water Curtain Hole of an Underground Water-sealed Cavern[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(1): 114-118 https://doi.org/10.3969/j.issn.1001-5485.2014.01.0232014,31(01):114-120

References

[1] 王 丰,刘 章. 水平定向钻孔技术的改进与应用[J].水利水电科技进展,2013,33(4): 54-56,77.(WANG Feng,LIU Zhang. Improvement and Application of Horizontal Directional Drilling Technology[J]. Advances in Science and Technology of Water Resources,2013,33(4): 54-56,77. (in Chinese))
[2] 姚宁平. 我国煤矿井下近水平定向钻进技术的发展[J]. 煤田地质与勘探,2008,36(4): 78-80.(YAO Ning-ping. Development Trend of Nearly Horizontal Directional Drilling Technology in Coal Mines of China[J]. Coal Geology & Exploration,2008,36(4): 78-80.(in Chinese))
[3] 刘小力. 三峡船闸高边坡预应力锚索造孔施工[J]. 水利水电技术,2004,35(7): 37-40.(LIU Xiao-li. Construction of Making Prestressed Cable Holes for the High Slopes of Three Gorges Project Ship Lock[J]. Water Resources and Hydropower Engineering,2004,35(7): 37-40.(in Chinese))
[4] 韩开平,谭开文. 超长精确造孔施工工艺[J]. 管理施工,2006,(3): 58-59.(HAN Kai-ping,TAN Kai-wen. Construction Technology of Super-long Accurate Hole[J]. Construction Management,2006,(3): 58-59. (in Chinese))
[5] DL/T 5331—2005,水利水电工程钻孔压水试验规程[S]. (DL/T 5331—2005,Code of Water Pressure Test in Borehole for Hydropower and Water Resources Engineering[S]. (in Chinese))
PDF(5003 KB)

Accesses

Citation

Detail

Sections
Recommended

/