JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2013, Vol. 30 ›› Issue (5): 86-91.DOI: 10.3969/j.issn.1001-5485.2013.05.019
• Hydraulic Structure and Material • Previous Articles Next Articles
ZHENG Chong-yang,PENG Hui,REN De-ji
Received:
Revised:
Online:
Published:
Abstract: Large flow and long span of the large-scale aqueduct in South-to-North Water Diversion Project pose higher requirements for the aqueduct design. Taking the Jihe River Aqueduct for example,the structural behavior of the aqueduct was simulated by using 3-D FEM method. In consideration of pre-stress and temperature load,the distribution of stress and deformation in different control sections of the aqueduct body was analyzed. Result indicates that the design of the aqueduct body section and the scheme of pre-stressed reinforcement are reasonable. Stress and displacement are within the allowable range and both meet the requirements of anti-crack and deflection.
Key words: south-to-north water diversion project , large aqueduct , pre-stress reinforcement , FEM method , thermal stress coupling
CLC Number:
TV67
ZHENG Chong-yang,PENG Hui,REN De-ji. Three-Dimensional FEM Analysis on Jihe River Aqueduct in the Middle Route of South-to-North Water Diversion Project[J]. JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI, 2013, 30(5): 86-91.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckyyb.crsri.cn/EN/10.3969/j.issn.1001-5485.2013.05.019
http://ckyyb.crsri.cn/EN/Y2013/V30/I5/86