长江科学院院报 ›› 2002, Vol. 19 ›› Issue (1): 31-34.

• 岩土力学 • 上一篇    下一篇

三峡工程地下电站开挖的粘弹性数值模拟及稳定性评价

 周火明, 丁秀丽, 盛谦   

  • 出版日期:2002-02-01 发布日期:2012-03-05

Viscoelastic numerical simulation and stability evaluation on excavation process of underground power station of TGP

 ZHOU  Huo-Ming, DING  Xiu-Li, SHENG  Qian-   

  • Online:2002-02-01 Published:2012-03-05

摘要: 以现场与室内岩石蠕变试验成果为基础,采用广义开尔文模型作为三峡花岗岩的粘弹性模型,对三峡工程地下厂房的施工开挖进行了粘弹性数值模拟。结果表明:当考虑岩体的流变特性后,围岩的变形约增加了5%~10%,洞室围岩在各开挖步下的变形通常持续7~10 d趋于稳定。

关键词: 三峡工程, 地下厂房, 开挖, 流变, 数值模拟, 稳定性

Abstract: Based on creep test results insitu and in laboratory on granite of Three Gorges Project(TGP), the viscoelastic numerical simulation on excavation process of the underground hydropower plants was performed by using the generalized Kelvin model as viscoelastic model of ranite.The calculation results show that the deformations of the surrounding rock mass increase by 5 to 10 percent when its creep characteristics are considered,and the deformations of rock mass under each excavation step may last 7-10 days and approach tostability. 