基于水下多波束的长江堤防护岸工程监测技术研究

邹双朝1a,1b,1c,皮凌华2,甘孝清1a,1b,1c,岳红艳1d   

  1. 1.长江科学院 a.工程安全与灾害防治研究所;b.水利部水工程安全与病害防治工程技术研究中心;c.国家大坝安全工程技术研究中心;d.河流研究所,武汉 430010;2.湖北省汉江河道管理局,湖北 潜江 433100
  • 收稿日期:2012-11-20 出版日期:2013-01-01 发布日期:2013-01-16
  • 作者简介:邹双朝(1978-),男,湖北麻城人,高级工程师,从事高精度工程测量与灾害监测系统研究及应用
  • 基金资助:

    水利部公益性行业科研专项(200901058);国家科技支撑计划课题(2012BAK10B04);国家大坝安全工程技术研究中心课题(2011NDS004);长江科学院科学研究基金项目(YWF0906,CKSF2010002)

Revetment Monitoring of Yangtze River Embankment by Underwater Multi-beam Sonar System

ZOU Shuang-chao1, PI Ling-hua2, GAN Xiao-qing1, YUE Hong-yan1   

  1. 1.Yangtze River Scientific Research Institute, Wuhan 430010, China; 2.Hubei Provincial Hanjiang River Channel Administration, Qianjiang 433100, China
  • Received:2012-11-20 Online:2013-01-01 Published:2013-01-16

摘要: 为了预防长江堤防护岸工程受损或者大面积崩岸的发生,应定期对护岸工程进行监测和稳定性分析,必要时采取工程措施消除安全隐患。根据水下多波束测深技术全覆盖、高精度、高效率等特点,探讨了水下多波束测深系统的平面位置和水深测量精度,论述了基于水下多波束的护岸工程监测技术方法。并以湖北省监利县铺子湾护岸工程为例,采用水下多波束测深技术,连续2 a同一时段进行全覆盖扫测,根据2次扫测结果,采用3种不同的分析方法对堤防护岸工程地形变化进行分析。结果表明:护岸工程实施后深槽向右岸偏移,岸坡冲淤平衡,护岸工程稳定。

关键词: 长江堤防, 护岸工程, 监测, 水下多波束

Abstract: The Yangtze River embankment should be regularly monitored and evaluated to prevent revetment works from damaging or bank collapsing. The authors discuss the accuracy of plane position and measurement depth of the underwater multi-beam sonar system according to its features such as full coverage, high precision and high efficiency. We also discuss the technique of monitoring revetment works by using underwater multi-beam technology taking Puziwan revetment project in Jianli county of Hubei province as an example. Full coverage sweeping survey was carried out for the embankment in the same period for two consecutive years. Having analyzed the topographic change of the embankment revetment by three different methods, we found that after the implementation of the revetment works, the deep groove moved towards the right bank, the bank slope erosion and deposition were in balance, and the revetment work was stable.      

Key words: Yangtze River embankment, revetment works, monitoring, underwater multi-beam sonar system