为研究偏压小间距隧道施工力学行为及围岩破坏规律。在CD法施工下,通过建立偏压小间距隧道有限元模型,利用ABAQUS有限元软件在不同开挖顺序及不同隧道间距下对偏压小间距隧道施工过程进行了动态模拟与分析,基于强度折减法基本原理,探讨了不同隧道间距下围岩塑性破坏规律,确定了合理隧道间距。研究结果表明:①在不同开挖顺序下,先行左洞开挖方式要优于先行右洞:②随着隧道间距的增加,左洞围岩位移不断减小,右洞围岩位移先减小后增加;③随着隧道间距的增加,沿中间岩柱竖向中心线的水平位移逐渐减小;竖向应力则表现为先减小后增大的规律;④右洞开挖完成后,两洞初期支护中右拱腰处的弯矩明显大于拱顶处,而轴力则反之;⑤随着隧道间距的增加,中间岩柱塑性贯通程度逐渐弱化,安全系数不断提高,等效塑性应变逐渐减小。研究结果可为偏压小间距隧道的设计与施工提供依据。
Abstract
The mechanics behavior and surrounding rock failure law of small-spacing tunnel under construction with unsymmetrical loading were studied via finite element method. The construction process (with CD (Center Diaphragm) construction method) with varied excavation sequence and tunnel distance was dynamically simulated and analyzed in ABAQUS. The rule of the plastic damage of surrounding rock under different spacing was discussed based on strength reduction method, and the reasonable tunnel spacing was determined. Results manifested that: 1) as for different excavation sequences, excavating the left tunnel first was superior to excavating the right tunnel first; 2) with the expansion of tunnel spacing, the displacement of surrounding rock of the left tunnel decreased continuously, while that of the right tunnel declined first and then increased; 3) also with the elongation of tunnel spacing, the horizontal displacement along the vertical center line of the intermediate rock column dropped gradually, whereas the vertical stress first reduced and then rose; 4) When the excavation of the right tunnel is completed, the bending moment at the right arch waist in the initial support of the two tunnels was obviously greater than that at the arch top, while the axial force was to the opposite; 5) with the increase of tunnel spacing, the plastic penetration degree of the intermediate rock column gradually weakened, the safety coefficient constantly improved, and the equivalent plastic strain gradually decayed. The research findings provide basis for the design and construction of small-spacing tunnel under unsymmetrical loading.
关键词
隧道工程 /
围岩位移 /
破坏规律 /
隧道间距 /
中间岩柱 /
中隔壁(CD)法 /
等效塑性应变 /
安全系数
Key words
tunnelling engineering /
displacement of surrounding rock /
failure law /
tunnel spacing /
intermediate rock column /
center diaphragm(CD) method /
equivalent plastic strain /
safety factor
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] JTG 3370.1—2018,公路隧道设计规范[S]. 北京:人民交通出版社,2018.
[2] 张顶立, 陈立平, 房 倩, 等. 小净距隧道中央岩墙稳定性分析及其应用[J]. 北京交通大学学报,2016,40(1):1-10.
[3] 何历超, 王梦恕, 李宇杰, 等. 浅埋大跨小间距黄土隧道支护技术研究[J]. 岩土力学,2013,34(增刊2):306-310.
[4] 腾俊洋, 唐建新, 张 闯,等. 浅埋偏压小净距隧道围岩压力分布与围岩控制[J]. 地下空间与工程学报,2018,14(3):761-762.
[5] 祁 寒, 高 波, 王帅帅,等.不同地质条件浅埋偏压小净距隧道施工力学效应研究[J]. 现代隧道技术,2014,51(4):108-111.
[6] CUI Shuai-shuai, WU Ke, ZHANG Qian-jin, et al. Analysis on Construction Mechanical Mechanism of Highway Tunnels with Large Span and Small Spacing[J]. Rock Mechanics and Rock Engineering, 2019, 37: 1627-1642.
[7] NIU Jia-yong, JIANG Xue-liang, WANG Fei-fei. Stability Analysis of Rock Slope with Small Spacing Tunnel under Earthquakes and Influence of Ground Motion Parameters[J]. Rock Mechanics and Rock Engineering, 2018, 36: 2437-2453.
[8] 李建林, 吴金刚, 毕 强. 大跨度小净距公路隧道设计与施工方法研究[J]. 现代隧道技术,2019,56(5):157-227.
[9] 李伟平, 邓学斌, 王 薇,等. 陡坡偏压小净距隧道合理施工方法研究[J]. 铁道科学与工程学报,2016,16(6):1135-1142.
[10] 孙振宇, 张顶立, 房 倩, 等. 浅埋小净距公路隧道围岩压力分布规律[J]. 中国公路学报,2018,31(9):84-94.
[11] 李 然, 张顶立, 房 倩, 等. 深埋3孔小净距隧道围岩压力计算方法及其工程应用[J]. 中国铁道科学,2020,41(2):81-89.
[12] 杜德持,王渭明,刘 鹏,等. 小净距隧道群稳定性判定因素及施工顺序优化研究[J]. 长江科学院院报,2018,35(4):109-116.
[13] 谭忠盛, 孟德鑫, 石新栋, 等. 大跨小间距黄土隧道支护体系及施工方法研究[J]. 中国公路学报,2015,28(11):81-97.
[14] 李 磊,谭忠盛,郭小龙,等. 挤压陡倾千枚岩地层小净距隧道大变形研究[J]. 岩石力学与工程学报,2019,38(2):276-286.
[15] 宋应潞,潘建平. 基于强度折减与刚度退化小净距隧道围岩稳定性研究[J]. 中国安全生产科学技术,2015,11(9):24-30.
[16] 刘文娟. 注浆锚杆对围岩加固作用机理及应用案例[J]. 科学技术与工程,2017,17(20):270-276.
[17] 陈卫忠,伍国军,贾善坡.ABAQUS 在隧道及地下工程中的应用[M]. 北京:中国水利水电出版社,2009.
[18] 侯瑞彬, 申玉生, 陈明奎. 基于强度折减法的浅埋偏压小净距隧道围岩稳定性分析[J]. 铁道标准设计, 2014,58(4):55-59.
[19] 郑余朝,张文胜,孙克国,等. 基于离散元强度折减法的大跨隧道稳定性研究[J]. 现代隧道技术,2020,57(1):18-24.
基金
湖南省教育厅科学研究重点项目(19A025);湖南省水利科技项目(XSKJ2019081-39);土木工程优势特色重点学科创新性基金项目(17ZDXK01)