JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2003, Vol. 20 ›› Issue (2): 57-60.

• . • Previous Articles     Next Articles

liminary analysis on supervision data of foundation deformation of TGP Shiplift during construction period

 GUO  Zuo-Jie, ZHU  Quan-Ping   

  • Online:2003-04-01 Published:2012-03-05

Abstract: This paper briefly analyses the situations of settlement deformation and horizontal deformation of foundation rock of the upper headof TGP shiplift during the construction period. A statistical model was established by using some inverted plumb lines monitoring data, and a quantitative analysis on horizontal displacement was made by this model. The results from preliminary analysis indicate that the foundation rock deformation is rational and the major structure is in safe and normal state at present.