JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2002, Vol. 19 ›› Issue (4): 7-10.
• . • Previous Articles Next Articles
JIN Bao-Fen, ZHANG Sheng-Ming, HUANG Guo-Bing, LIAO Ning
Online:
Published:
Abstract: The diversion tunnels of the Shuibuya Project feature high head, big discharge, long tunnel line and complicated geologic conditions. For solving their hydraulic problems, a model test with a scale of 1∶80 was conducted. The paper summarizes the main results, including discharge capacity and the main factors affecting it, pressure characteristics and its improvement measures, and the comparison of energy dissipation schemes downstream the outlet. The research results offers basic data for optimal design of the diversion tunnels.
JIN Bao-Fen, ZHANG Sheng-Ming, HUANG Guo-Bing, LIAO Ning. Hydraulic test research on construction diversion tunnels of Shuibuya Project[J]. JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI, 2002, 19(4): 7-10.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckyyb.crsri.cn/EN/
http://ckyyb.crsri.cn/EN/Y2002/V19/I4/7