JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2001, Vol. 18 ›› Issue (4): 9-13.

• . • Previous Articles     Next Articles

Hydrodynamic characteristics of changing topaltitude tailrace tunnel for Three Gorges Project's underground power plant

 XUE  A-Qiang, LUO  Yu-Quan, WANG  Lie, YAN  Wei-   

  • Online:2001-08-01 Published:2012-03-05

Abstract: The test tesearch on hydraulic transient process inside the changing topaltitude tailrace tunnel of TGP'sunderground power plant was conducted for the firsttime in our country by use of a model generating set.Adopting the piece wise linear closure for guide vanes of turbine,the best inflection point of twostepclosure (i.e.closed in two kinds of uniform speed)was found,and it was verfiedthat the method of twostep closure has obvious effect for decreasing negative pressures and the rising rates of rotational speed of generating set.Through the measurement of hydraulicparameters,it was regarded that the changing topaltitude tailraee tunnel scheme can meet all the technical reqirements,and it is anewtype design scheme benificial for decreasing rock excavation and saving engineering investment.It can be widely applied in underground plant.
