JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2001, Vol. 18 ›› Issue (1): 49-51.
• . • Previous Articles Next Articles
XU Wei-Jun, LI Gang-
Online:
Published:
Abstract: For understanding the stress state of locked anchorbars at the top of TGP perm anent lock's vertical slope,and effectively evaluating their construction quali ties and anchoring effects,several anchor stress meters were located at partial locked anchorbars,and monitoring were practised. The monitoring results of str esses measured from anchorbars showed that anchoring effects of anchorbars a re obvious,the deformation of permanent lock's vertical slope basically tends t owards stability
XU Wei-Jun, LI Gang-. A Analysis on monitoring results of locked anchorbar stress at TGP permanent lock's vertical slope[J]. JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI, 2001, 18(1): 49-51.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckyyb.crsri.cn/EN/
http://ckyyb.crsri.cn/EN/Y2001/V18/I1/49