长江科学院院报 ›› 2014, Vol. 31 ›› Issue (5): 29-33,38.DOI: 10.3969/j.issn.1001-5485.2014.05.006

• 工程安全与灾害防治 • 上一篇    下一篇

基于模糊综合评价的改进层次分析法在滑坡危险评价中的应用

胡启芳1,范雷1,董治军2,周火明1,杨宜1,李亚杰1   

  1. 1.长江科学院 水利部岩土力学与工程重点实验室,武汉 430010;
    2.中国电力工程顾问集团 中南电力设计院,武汉 430071
  • 收稿日期:2013-03-21 修回日期:2014-05-12 出版日期:2014-05-12 发布日期:2014-05-12
  • 作者简介:胡启芳(1986-),女,湖北襄阳人,硕士研究生,主要从事岩石力学实验方面的研究工作,(电话)15871736200(电子信箱)812575935@qq.com。
  • 基金资助:
    国家重点基础研究发展计划(973)项目(2011CB710603);中央级公益性科研院所基本科研业务费项目(CKSF2011022/YT);水利部公益性行业科研专项(201001008)

Application of Modified Analytic Hierarchy Process Based on Fuzzy Comprehensive Evaluation to Landslide Risk Assessment

HU Qi-fang1, FAN Lei1, DONG Zhi-jun2,ZHOU Huo-ming1, YANG Yi1, LI Ya-jie1   

  1. 1.Key Laboratory of Geotechnical Mechanics and Engineering of MWR, Yangtze River Scientific Research Institute, Wuhan 430010, China;
    2.Central Southern China Electric Power Design Institute of China Power Engineering Consulting Group,Wuhan 430071,China
  • Received:2013-03-21 Revised:2014-05-12 Online:2014-05-12 Published:2014-05-12

摘要: 在野外调查的基础上,针对金沙江乌东德库区工程地质条件,选取坡度、地层岩性、地质构造、岸坡结构等10个与滑坡发生相关要素作为库岸滑坡灾害危险性评价因子,基于模糊综合评判法模型的改进层次分析方法,对乌东德库区库岸滑坡灾害进行危险性评价。研究结果表明:乌东德库区可划分为高危险区、中危险区、低危险区和极低危险区4个区域;所占库区面积比例分别为6.64%,5.77%,60.20%,27.39%,为库岸滑坡的防灾减灾管理和治理提供了支撑。

关键词: 改进层次分析法, 模糊综合评价, 危险性评价

Abstract: According to filed investigation on the engineering geological conditions of Wudongde reservoir area in Jinsha River, we selected slope angle, formation lithology, geological structure, bank slope structure and other 6 factors to assess the bank slope landslide hazard. Fuzzy comprehensive evaluation (FCE) model and modified analytic hierarchy process (AHP) are employed for the hazard assessment. Results revealed that the Wudongde reservoir area can be divided into high risk area, medium risk area, low risk area, and extremely low risk area, respectively accounting for 6.64%, 5.77%, 60.20%, and 27.39% of the whole area. The result provides support for the prevention, reduction, and governance of bank slope landslides.

Key words: modified AHP, FCE, risk assessment