高水头放空洞泄洪消能试验研究与运用

王才欢 , 侯冬梅, 向光红

长江科学院院报 ›› 2010, Vol. 27 ›› Issue (4) : 36-39.

PDF(2246 KB)
PDF(2246 KB)
长江科学院院报 ›› 2010, Vol. 27 ›› Issue (4) : 36-39.
水力学

高水头放空洞泄洪消能试验研究与运用

  • 王才欢1 , 侯冬梅1, 向光红2
作者信息 +

Research and Utilization on Flood Discharging and Energy Dissipating for Emptying Tunnel with High Head

  • WANG Cai-huan 1, HOU Dong-mei1, XIANG Guang-hong2
Author information +
文章历史 +

摘要

水布垭枢纽放空洞主要承担水布垭工程施工期后期导流及完建后大坝检修时放空水库的任务。它具有水头高、水位变幅大、流速大、运行时间长等特点,经过1∶58水工整体模型多种方案的比较研究,首次提出了一种新型的双曲双槽差动鼻坎消能工形式;经过2007年超高水位、长时间的泄洪运行检验,该消能工成功地解决了放空洞高水头、大变幅、大夹角、窄河谷且地质条件较差的消能防冲难题;同时,该型鼻坎消能工无任何蚀损。

Abstract

The emptying tunnel of the Shuibuya Project will be used for both the diversion during the late construction and the emptying of the reservoir for maintenance after completion of the dam. It possesses the characters of high head, large variation range of water level , high velocity and long operation time. Through comparative researches of many plans in a scale 1∶58 hydraulic model, a new energy dissipator, i.e. hyperbolic differential dentated bucket lip was proposed for the first time, and the scheme successfully has solved the difficult problems about flood discharging and energy dissipating in the emptying tunnel under the conditions of high head, large variation in water level, big spreading angle, narrow valley and poor rock properties; at the same time, this energy dissipator has no any cavitation erosion phenomenon so far.

关键词

放空洞 / 泄洪消能 / 鼻坎消能工 / 时均压力 / 空化空蚀 / 水流掺气 / 模型试验

Key words

emptying tunnel / flood discharging and energy dissipating / doublecurved differentialdentated bucket lip / energy dissipator

引用本文

导出引用
王才欢 , 侯冬梅, 向光红. 高水头放空洞泄洪消能试验研究与运用[J]. 长江科学院院报. 2010, 27(4): 36-39
WANG Cai-huan , HOU Dong-mei, XIANG Guang-hong. Research and Utilization on Flood Discharging and Energy Dissipating for Emptying Tunnel with High Head[J]. Journal of Changjiang River Scientific Research Institute. 2010, 27(4): 36-39
中图分类号: TV135.2   

PDF(2246 KB)

Accesses

Citation

Detail

段落导航
相关文章

/