长江科学院院报 ›› 2024, Vol. 41 ›› Issue (10): 149-156.DOI: 10.11988/ckyyb.20240694

• 工程安全与灾害防治 • 上一篇    下一篇

深埋隧洞穿高压富水断层涌水突泥分析与处置技术

李建贺1(), 牛利敏1, 王帅2(), 许然1, 陈培3   

  1. 1 长江勘测规划设计研究有限责任公司 水利部水网工程与调度重点实验室, 武汉 430010
    2 武汉工程大学 土木工程与建筑学院, 武汉 430205
    3 云南省滇中引水工程建设管理局 大理分局,云南 大理 671000
  • 收稿日期:2024-07-01 修回日期:2024-08-14 出版日期:2024-10-01 发布日期:2024-10-25
  • 通讯作者: 王 帅(1986-),男,安徽六安人,副教授,博士,主要从事工程岩体稳定性评价研究。E-mail: 51658751@qq.com
  • 作者简介:

    李建贺(1989-),男,河北邯郸人,高级工程师,博士,主要从事引调水工程设计与科研攻关。E-mail:

  • 基金资助:
    水利部重大科技项目(SKS-2022103); 云南省重大科技专项计划项目(202002AF080003); 长江设计集团自主创新项目(CX2021Z01)

Management Technology for Water and Mud Inrush in Deeply Buried Tunnel Crossing High-pressure Water-rich Faults

LI Jian-he1(), NIU Li-min1, WANG Shuai2(), XU Ran1, CHEN Pei3   

  1. 1 Key Laboratory of Water Grid Project and Regulation of Ministry of Water Resources, Changjiang Survey Planning Design and Research Co., Ltd., Wuhan 430010, China
    2 School of Civil Engineering and Architecture, Wuhan Institute of Technology, Wuhan 430205, China
    3 Dali Branch of Central Yunnan Water Diversion Project Construction Management Bureau, Dali 671000, China
  • Received:2024-07-01 Revised:2024-08-14 Published:2024-10-01 Online:2024-10-25

摘要:

针对隧洞穿越高压富水断层涌水突泥破坏性强、可灌性差的难题,以滇中引水工程香炉山隧洞过大栗树断裂次级断层涌水突泥灾害治理为例,通过分析隧洞涌水突泥洞段的地质特征、灾害过程与成因,提出了超前钻探、超前灌浆、超前泄压、超前支护组合处置对策。针对隧洞下半断面围岩碎粉含量高、阻止浆液扩散导致注浆效果不佳的问题,提出了置换式注浆加固技术,即注浆孔分A孔、B孔,通过A孔注浆,B孔泄压并冲出岩粉的方式进行注浆,以利于岩粉排出和浆液扩散,成功解决了香炉山隧洞DLI3+681.5涌水突泥灾害治理技术难题。研究成果对类似地质条件下隧洞涌水突泥灾害治理提供参考。

关键词: 深埋隧洞, 富水断层, 涌水突泥, 处置对策, 置换式注浆加固技术, 灾害治理

Abstract:

Water and mud inrush in tunnels crossing high-pressure water-rich faults is highly destructive with low groutability. To address this challenge, we examined the geological characteristics, disaster processes, and causes associated with water and mud inrush in the Xianglushan Tunnel of Central Yunnan Water Diversion Project as a case study. We propose a combined management strategy consisting of drilling, grouting, pressure relief, and support all in advance. To tackle the high content of fine powder in the surrounding rock of the tunnel’s lower half section, which impedes the diffusion of grouting slurry, we introduce a replacement grouting reinforcement technique. This technique involves dividing the grouting holes into top holes and back (or horizontal) holes. Grout is injected through the top holes, while pressure is released through the back or horizontal holes to flush out rock powder. This approach facilitates the removal of rock powder and improves slurry diffusion. Our method successfully resolves the water and mud inrush disaster in DLI3+681.5 section of Xianglushan Tunnel. The research findings offer valuable insights for managing water and mud inrush disasters in tunnels with similar geological conditions.

Key words: deeply buried tunnel, water-rich fault, water and mud inrush, management measures, replacement grouting reinforcement technology, disaster management