长江科学院院报 ›› 2003, Vol. 20 ›› Issue (2): 57-60.

• 工程监测 • 上一篇    下一篇

三峡工程升船机施工期基础变形监测初步分析

 郭祚界, 朱全平   

  • 出版日期:2003-04-01 发布日期:2012-03-05

liminary analysis on supervision data of foundation deformation of TGP Shiplift during construction period

 GUO  Zuo-Jie, ZHU  Quan-Ping   

  • Online:2003-04-01 Published:2012-03-05

摘要: 简要分析了升船机上闸首基础岩体随上部建筑物施工过程的沉降变形与水平变形情况,并以部分倒垂为例,建立统计模型,对水平位移初步进行定量分析。分析结果认为,基础岩体变形合理,目前建筑物安全状态正常。

关键词: 三峡工程升船机, 基础变形, 数学统计模型

Abstract: This paper briefly analyses the situations of settlement deformation and horizontal deformation of foundation rock of the upper headof TGP shiplift during the construction period. A statistical model was established by using some inverted plumb lines monitoring data, and a quantitative analysis on horizontal displacement was made by this model. The results from preliminary analysis indicate that the foundation rock deformation is rational and the major structure is in safe and normal state at present.