武汉地铁名都车站基坑开挖监测与数值分析
连宝琴,胡斌,王新刚,刘飞,余宏明
Monitoring and Numerical Analysis on the Foundation Pit Excavation for Mingdu Station of Wuhan Subway
LIAN Bao-qin,HU Bin, WANG Xin-gang,LIU Fei,YU Hong-ming
长江科学院院报 . 2014, (5): 34 -38 .  DOI: 10.3969/j.issn.1001-5485.2014.05.007