长江科学院院报 ›› 2009, Vol. 26 ›› Issue (12): 66-70.

• 岩土工程 • 上一篇    下一篇

岩石高边坡施工期稳定性综合评价

 张金龙, 徐卫亚   

  • 出版日期:2009-12-01 发布日期:2012-07-05

Stability Comprehensive Evaluation of High Rock Slope during Construction Period

 ZHANG  Jin-Long, XU  Wei-Ya-   

  • Online:2009-12-01 Published:2012-07-05

摘要: 边坡稳定性评价是边坡施工期的关键问题之一,单一的评价方法具有不充分性和不完善性。锦屏一级水电站左岸边坡地质条件复杂,边坡稳定性问题突出。分析了左岸边坡岩体变形破坏机理和失稳模式,计算了各种失稳模式的安全稳定系数,结合多种监测成果以及参考几个典型人工岩石边坡失稳及监测结果,对锦屏一级水电站左岸岩石高边坡稳定性进行了综合评价。研究结果表明左岸边坡目前基本处于稳定状态,边坡支护设计基本满足边坡稳定性要求。并提出了边坡安全监测建议。

Abstract: The stability evaluation of high rock slope is one of key issues during construction period. A unitary evaluation method is inadequate and incomplete. The stability of left bank slope of Jinping First Stage Hydropower Station is very outstanding because of its complicated geological conditions. The deformation mechanism and slide modes of left bank slope were analyzed and the safety factor of each mode was calculated. The stability of left bank slope during construction period was evaluated synthetically by using various safety monitored results and those results with several typical unstable rock slopes were compared. Research result shows that the left bank slope is stable basically and support measures can satisfy the stability requirement and some suggestions on safety monitoring were given.