长江科学院院报 ›› 2013, Vol. 30 ›› Issue (1): 76-79.DOI: 10.3969/j.issn.1001-5485.2013.01.015

• 仪器设备与测试技术 • 上一篇    下一篇

水电机组性能参数综合测试系统综述

潘熙和1,黄业华1,程远楚2   

  1. 1.长江科学院 武汉长江控制设备研究所,武汉 430010;  2.武汉大学 动力与机械学院, 武汉 430072
  • 收稿日期:2012-09-26 出版日期:2013-01-01 发布日期:2013-01-16
  • 作者简介:潘熙和(1965-),男,湖北阳新人,教授级高级工程师,主要从事电站控制设备的研究

An Integrative Testing System for the Performance Indexes of Hydropower Generating Units

PAN Xi-he1, HUANG Ye-hua1, CHENG Yuan-chu2   

  1. 1. Wuhan Changjiang Control Equipment Research Institute, Yangtze River Scientific Research Institute, Wuhan 430010,China; 2. School of Power and Mechanical Engineering, Wuhan University, Wuhan 430072, China
  • Received:2012-09-26 Online:2013-01-01 Published:2013-01-16

摘要: 介绍了水电机组性能参数综合测试系统, 7个子功能装置及其分析平台。阐述了该系统能实现对水电机组性能指标(安全性、稳定性、可靠性、经济性)的全面科学评价,彻底改变我国水电机组关键监测设备依赖进口的现状,提高我国水电机组监测仪器设备的自主创新能力与装备水平,支撑科技创新,服务国民经济与社会发展。

关键词: 子装置, 分析平台, 同步采样, 性能参数, 综合测试

Abstract: An integrative testing system for the performance indexes (security, stability, reliability, and economy) of hydropower generating units is presented. The system consists of 7 sub-function devices and an analysis platform. The 7 sub-function devices are respectively responsible for the monitoring of cavitation and pressure fluctuation of hydroturbine, partial discharge of generator, air gap of generator, energy efficiency of power units, vibration and throw of power units, as well as the testing and simulation of hydro-turbine's governing system performance, and the testing and simulation of generator's excitation system performance. With this system, the performance indexes could be comprehensively and scientifically evaluated. China's dependence on the import of crucial monitoring equipment for hydropower unit can be changed thoroughly. Our innovation ability and the level of monitoring equipment for hydroelectric generating sets can be improved. 

Key words: sub-device, analysis platform, synchronous sampling, performance index, integrative testing      

中图分类号: