长江科学院院报 ›› 2003, Vol. 20 ›› Issue (1): 19-22.

• 岩土力学 • 上一篇    下一篇

清江水布垭面板堆石坝趾板 可利用建基面标准研究

 周火明, 李维树, 熊诗湖, 王法刚   

  • 出版日期:2003-02-01 发布日期:2012-03-05

Research on standard of utilizable foundation rock mass at toe-plate

 ZHOU  Huo-Ming, LI  Wei-Shu, XIONG  Shi-Hu, WANG  Fa-Gang-   

  • Online:2003-02-01 Published:2012-03-05

摘要: 通过工程类比、建坝岩体力学性质研究成果分析、趾板区岩体声波测试、岩体变形试验以及岩体质量评价等多种方法对趾板建基岩体性状进行综合分析,确定了水布垭面板堆石坝趾板可利用建基面标准。提出了以硬岩声波波速3.8 km/s,相对软岩声波波速3.2 km/s作为建基面验收标准,并以弱卸荷带岩体作为水布垭面板堆石坝趾板建基面。

Abstract: A synthetical analysis on utilizable foundation rock at the toe-plate of dam is conducted by several kinds of methods, e.g., project analog study, analyses on results of rock mechanics properties for existed dams, sonic wave tests for rock mass at the toe-plate area, deformation tests and quality assessment for the rock mass, the standard of utilizable foundation rock at the toe-plate of concrete face rock-fill dam of Shuibuya Project is determined. The acceptable standards of utilizable rock mass in which sonic wave speed through hard rock equals 3.8 km/s and that through soft rock 3.2 km/s are proposed. The weak unloaded zone of rock mass may be taken as rock base-plane of the toe-plate for Shuibulya Project.