固结灌浆后岩体变形模量的确定方法——以高摩赞大坝枢纽工程为例

  • 陈书文,许仙娥
作者信息 +

An Approach of Determining the Deformation Modulus of Rock Mass after Consolidation Grouting:Case Study of Gomal Zam Dam Multipurpose Project

  • CHEN Shu-wen,XU Xian-e
Author information +
文章历史 +

摘要

根据国内外工程经验,岩体变形模量的确定方法主要有现场试验和间接估算。固结灌浆后建基岩体的变形模量,往往难以进行大量的现场试验,而固结灌浆后的检查孔多会进行孔内声波测试。结合工程实例,在取得大量纵波测试数据和现场岩体变形模量试验资料基础上,拟合出纵波速度与岩体变形模量的相关关系,利用固结灌浆检查孔实测声波纵波速度,采用拟合的相关关系,对固结灌浆后岩体变形模量进行估算的方法,经济、便捷地取得灌浆后岩体的变形模量值。为工程设计复核提供了可靠的依据,可用于相似工程或试验资料不足工程灌浆岩体变形模量的确定。

Abstract

The deformation modulus of rock mass is generally directly determined by field tests and indirectly estimated by relationships with other geo-parameters. For dam foundation rock mass,it is impractical to carry out sufficient field tests to verify the improvement of modulus after consolidation grouting. In this research,several relationships for estimating the value of grouted rock mass deformation modulus were proposed on the basis of longitudinal wave velocity,which can be economically and conveniently measured by geophysical prospecting. Gomal Zam Dam multipurpose project was taken as an example. This approach could be applied to determine the rock mass deformation modulus of similar projects or projects in lack of field data.

关键词

变形模量 / 固结灌浆 / 建基岩体 / 变形试验 / 纵波速度

Key words

deformation modulus / consolidation grouting / dam foundation rockmass / field deformation test / longitudinal wave velocity

引用本文

导出引用
陈书文,许仙娥. 固结灌浆后岩体变形模量的确定方法——以高摩赞大坝枢纽工程为例[J]. 长江科学院院报. 2014, 31(1): 58-60 https://doi.org/10.3969/j.issn.1001-5485.2014.01.0122014,31(01):58-60,76
CHEN Shu-wen,XU Xian-e. An Approach of Determining the Deformation Modulus of Rock Mass after Consolidation Grouting:Case Study of Gomal Zam Dam Multipurpose Project[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(1): 58-60 https://doi.org/10.3969/j.issn.1001-5485.2014.01.0122014,31(01):58-60,76
中图分类号: TU452   

参考文献

[1] SL264—2001,水利水电岩石试验规程[S]. (SL264—2001,Specifications for Rock Tests in Water Conservancy and Hydroelectric Engineering [S].(in Chinese))
[2] CHUN B S,LEE Y J,SEO D D,et al. Correlation of Deformation Modulus by PMT with RMR and Rock Mass Condition[J]. Tunneling and Underground Space Technology,2006,(21): 231-232.
[3] BARTON N,LOSET F,LIEN R,et al. Application of Q-system in Design Decisions Concerning Dimensions and Appropriate Support for Underground Installations[C]∥International Society for Rock Mechanics. Proceedings of the International Conference of Subsurface Space,Rockstore. Stockholm,Sweden. June 23-27,1980:553-561.
[4] GB 50487—2008,水利水电工程地质勘察规范[S]. (GB 50487—2008,Code for Engineering Geological Investigation of Water Resources and Hydropower[S].(in Chinese))
[5] 张占荣,盛 谦,杨艳霜,等.基于现场试验的岩体变形模量尺寸效应研究[J].岩土力学,2010,31(9): 2875-2881.(ZHANG Zhan-rong,SHENG Qian,YANG Yan-shuang,et al. Study of Size Effect of Rock Mass Deformation Modulus Based on In-situ Test[J]. Rock and Soil Mechanics,2010,31(9): 2875-2881.(in Chinese))
[6] 宋彦辉,巨广宏,孙 苗. 岩体波速与坝基岩体变形模量关系[J].岩土力学,2011,32(5):1507-1512.(SONG Yan-hui,JU Guang-hong,SUN Miao. Relationship between Wave Velocity and Deformation Modulus of Rock Masses[J]. Rock and Soil Mechanics,2011,32(5): 1507-1512.(in Chinese))

PDF(1030 KB)

Accesses

Citation

Detail

段落导航
相关文章

/