三河口水利枢纽工程坝址区河谷应力场分析研究

赵宪民,尹健民,李永松,周春华

长江科学院院报 ›› 2013, Vol. 30 ›› Issue (2) : 31-34.

PDF(1121 KB)
PDF(1121 KB)
长江科学院院报 ›› 2013, Vol. 30 ›› Issue (2) : 31-34. DOI: 10.3969/j.issn.1001-5485.2013.02.007
岩土工程

三河口水利枢纽工程坝址区河谷应力场分析研究

  • 赵宪民1,3,尹健民2,李永松2,周春华2
作者信息 +

In-situ Stress in the River Valley of Dam Site of Sanhekou Hydro-Junction

  • ZHAO Xian-min1,3, YIN Jian-min2, LI Yong-song2, ZHOU Chun-hua2
Author information +
文章历史 +

摘要

 三河口水利枢纽工程地处东秦岭地区的河谷地段,复杂地质结构和复杂地形地貌决定了工程区地应力分布的复杂性。为了研究其地应力分布情况,采用水压致裂法在左右坝肩边坡和河床部位3个钻孔进行现场地应力测量。测试结果表明:河床部位测孔埋深0~50 m及两岸边坡测孔500~530 m高程岩体应力量值较大,可划为应力增高区;而河床测孔埋深50 m以下和边坡测孔500 m高程以下,可归为原岩应力区;河床浅部岩体最大水平主应力方位与河流走向基本垂直,随着埋深的增加而向区域构造方位靠近;边坡浅层岩体最大水平主应力方向与河流在该段走向呈小角度相交,随着竖直埋深的增加,最大水平主应力方位逐渐向NE向过渡,而接近区域构造方位。

Abstract

Sanhekou Hydro-junction project is located in the river valley of east Qinling area. Complex geological structure and topography determines the complexity of in-situ stress distribution. To investigate the distribution of in-situ stress, hydraulic fracturing test was carried out on 3 boreholes in the slopes of both abutments and the river bed. Measured results show that the stress values are relatively large in buried depth of 0-50m in borehole at the river bed, and elevation of 500-530m in the boreholes at both banks, which can be designated as increased stress zone. Meanwhile, the area of buried depth under 50m in the borehole of river bed and elevation under 500m in the boreholes of both banks can be designated as original stress zone. In the shallow rockmass under the riverbed, the orientation of maximum horizontal principal stress is nearly perpendicular to the river trend, and with the increase of burial depth, it is close to the direction of regional structure. In the surface rockmass of slope, the direction of maximum horizontal principal stress intersects with the river trend at an small angle, and with the increase of burial depth, it transits to the northeast gradually. In deep buried rock mass, the direction of maximum horizontal principal stress is close to the regional tectonic.  

关键词

  / 三河口水利枢纽工程 / 地应力 / 区域构造

Key words

Sanhekou hydro-junction project / in-situ stress / regional tectonic 

引用本文

导出引用
赵宪民,尹健民,李永松,周春华. 三河口水利枢纽工程坝址区河谷应力场分析研究[J]. 长江科学院院报. 2013, 30(2): 31-34 https://doi.org/10.3969/j.issn.1001-5485.2013.02.007
ZHAO Xian-min, YIN Jian-min, LI Yong-song, ZHOU Chun-hua. In-situ Stress in the River Valley of Dam Site of Sanhekou Hydro-Junction[J]. Journal of Changjiang River Scientific Research Institute. 2013, 30(2): 31-34 https://doi.org/10.3969/j.issn.1001-5485.2013.02.007
中图分类号: TV223.31         

基金

国家重点基础研究发展计划973项目(2011CB710603);水利部公益性行业科研专项项目(201001009);中央级公益性科研院所基本科研业务费项目(CKSF2011020/YT)


PDF(1121 KB)

Accesses

Citation

Detail

段落导航
相关文章

/