高拱坝混凝土一期控温阶段温度变化动态预测方法
黄建文, 李飞翔, 袁华, 王兴霞, 江谊园, 叶林华
Dynamically Predicting Temperature Change in the First Phase Temperature Control Stage for High Arch Dam Concrete
HUANG Jian-wen, LI Fei-xiang, YUAN Hua, WANG Xing-xia, JIANG Yi-yuan, YE Lin-hua
长江科学院院报
.
2022, (2): 141
-146
.
DOI: 10.11988/ckyyb.20201119