长江科学院院报 ›› 2016, Vol. 33 ›› Issue (9): 149-153.DOI: 10.11988/ckyyb.20150582

• 信息技术应用 • 上一篇    

高RCC拱坝施工期温控决策支持平台研究

裴亮1a,1b,徐建江2,何坤1a,1b,吴震宇1a,1b,陈建康1a,1b   

  1. 1.四川大学 a.水力学与山区河流开发保护国家重点实验室;b.水利水电学院,成都 610065;
    2. 中国电建集团 成都勘测设计研究院有限公司,成都 610072
  • 收稿日期:2015-07-14 修回日期:2015-08-21 出版日期:2016-09-25 发布日期:2016-09-22
  • 通讯作者: 陈建康(1963-),男,甘肃靖远人,教授,博士生导师,主要从事水工结构方面的研究工作,(电话)028-85405601(电子信箱)SCU-jiankang@163.com。
  • 作者简介:裴 亮(1986-),男,内蒙古阿拉善盟人,讲师,博士,研究方向为大体积混凝土温控防裂,(电话)18628096381(电子信箱)peiliang8649@163.com。
  • 基金资助:
    四川大学青年教师科研启动基金项目(2014SCU11018)

Decision Support Platform of Temperature Control for RCC High Arch Dam in Construction Stage

PEI Liang1,2, XU Jian3, HE Kun1,2, WU Zhen yu1,2, CHEN Jian kang1,2   

  1. 1.State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University, Chengdu 610065,China;
    2. College of Water Resource & Hydropower, Sichuan University, Chengdu 610065, China;
    3.Chengdu Engineering Corporation Limited, Power China, Chengdu 610072, China
  • Received:2015-07-14 Revised:2015-08-21 Published:2016-09-25 Online:2016-09-22

摘要: 混凝土高坝开裂是普遍存在的现象,国内外许多混凝土坝都因施工裂缝而被迫停工处理。混凝土高坝的浇筑施工过程受到自然环境、结构形式、温控、资源等多种因素的影响,如何综合考虑这些影响因素制定切实可行的大坝浇筑施工计划,并在施工过程中加强对混凝土温度和应力的实时监控和科学管理十分必要。混凝土高坝施工过程决策支持系统的研究开发,能够为水电大坝的建设和安全提供先进的管理路径,具有巨大的潜在效益。以立洲水电站工程为依托,研发了高RCC拱坝施工期温控决策支持平台,实现了碾压参数、温控信息、监测数据和仿真成果等数据信息的高效管理,大坝温控防裂效果和趋势的实时监控和预测预警,以及专家远程会商决策支持,对促进高RCC拱坝施工温控决策支持科学化水平和确保施工质量具有重要意义。

关键词: RCC拱坝, 混凝土, 温控防裂, 决策支持, 预警预报

Abstract: Cracking in high concrete dam is a common problem. Many concrete dams in China and abroad are forced to shut down due to cracks in construction. The process of pouring high concrete dam is affected by natural environment, structure, temperature control, resources and other factors. It is necessary to develop a practical plan of dam construction by considering these factors. Real time monitoring and scientific management of concrete temperature and stress during construction are also requisite. Research and development of decision support system for concrete dam construction can provide advanced management approach for the construction and safety of hydroelectric dams, and potential benefits will be huge. With the project of Lizhou hydropower station as research background, a temperature control decision support platform for high RCC arch dam is developed. Through this platform, data information such as rolling parameters, temperature control information, monitoring data and simulation results are efficiently managed. Moreover, the effect and trend of temperature control are realtime monitored and predicted, earlywarning is accomplished and decisionsupport from experts remote consultation is provided. These results are of important significance for promoting the scientific level of construction temperature control decision support for high RCC arch dam and ensuring the construction quality.