长江科学院院报 ›› 2012, Vol. 29 ›› Issue (8): 58-61.DOI: 10.3969/j.issn.1001-5485.2012.08.011

• 岩石力学与工程试验及测试技术专辑 • 上一篇    下一篇

锦屏超高压岩体水压致裂法地应力测试系统研制与应用

马 鹏,  赵国平,  张永永,  吴春耕   

  1. 浙江华东工程安全技术有限公司,杭州 310014
  • 收稿日期:2012-05-22 出版日期:2012-08-01 发布日期:2012-08-22
  • 作者简介:马鹏(1962-),男,福建莆田人,教授级高级工程师,主要从事岩石力学试验方面研究工作

Preparation and Application of Ultrahigh Pressure Hydro-fracturing Geostress Measurement System in Rockmass

MA Peng, ZHAO Guo-ping, ZHANG Yong-yong, WU Chun-geng   

  1. Zhejiang Huadong Engineering Safety Technology Co., Ltd., Hangzhou 310014, China
  • Received:2012-05-22 Online:2012-08-01 Published:2012-08-22

摘要: 锦屏二级水电站引水隧洞上覆岩体一般埋深1 500~2 000 m,最大埋深约为2 525 m,具有埋深大、洞线长、洞径大的特点,为超深埋长隧洞特大型地下水电工程。最大地应力可达到70 MPa以上,在隧洞开挖过程中,由于存在超高的地应力,局部岩体出现了强烈的岩爆和变形,给隧洞的设计、施工及安全带来很大的困难和隐患。加上钻孔中经常出现岩饼现象,常规的孔径应变法和水压致裂法地应力测试难以有效进行。为了能够实测到深部岩体的地应力状况,开展了超高压应力状态下的岩体地应力测试方法研究,成功研制出了超高压水压致裂法地应力测试系统,并在锦屏工程中得到了实际应用,取得了良好的测试成果。此测试系统的成功研发,为将来在公路、铁路、水电和矿业等领域的超埋深超高地应力的测试提供了条件。

关键词: 锦屏二级水电站, 超高压, 地应力, 水压致裂, 测试系统

Abstract: The diversion tunnel of Jinping-Ⅱ Hydropower Station is an oversized underground project. It is noted for its deep location, long length and large diameter. The common depth of the diversion tunnel is 1 500 to 2 000 m, with the maximum depth of around 2 525 m. In view of the presence of ultrahigh geostress, which may exceed 70 MPa, violent rock burst and deformation usually occurred during the tunnel construction. In addition, core discings were usually found in boreholes, which made it difficult to measure the geostress through conventional aperture-strain method and hydro-fracturing method. To measure the geostress in deep rock mass, we developed a measurement system for the ultrahigh pressure hydro-fracturing geostress. This system consists of specifically designated high-pressure oil pump, seamless steel tube, packer, oil tube, and measurement instruments. It has been used at Jinping-Ⅱ Hydropower Station and good results were achieved. This system provides with an insight for the measurement of ultrahigh pressure geostress in fields of highway, railway, hydropower, and mining.

Key words: Jinping-Ⅱhydropower station, ultrahigh pressure, geostress, hydro-fracturing, measurement system

中图分类号: