长江科学院院报 ›› 2022, Vol. 39 ›› Issue (8): 10-16.DOI: 10.11988/ckyyb.20211393

• 河湖保护与治理 • 上一篇    下一篇

三峡建库前后长江中游河道输沙率变化分析

姚仕明, 邢国栋, 陈栋   

  1. 长江科学院 水利部长江中下游河湖治理与防洪重点实验室,武汉 430010
  • 收稿日期:2021-12-27 修回日期:2022-03-02 出版日期:2022-08-01 发布日期:2022-08-01
  • 作者简介:姚仕明(1974-),男,安徽庐江人,正高级工程师,博士,博士生导师,研究方向为河湖保护与治理。E-mail:yzhshymq@163.com
  • 基金资助:
    国家自然科学联合基金项目(U2240224);长江中下游河道保护与治理研究创新团队(CKSF2021530/HL)

Changes in Sediment Transport Rate in the Midstream of Yangtze River Before and After the Construction of Three Gorges Reservoir

YAO Shi-ming, XING Guo-dong, CHEN Dong   

  1. Key Laboratory of River and Lake Regulation and Flood Control in the Middle and Lower Reaches of Yangtze River of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan 430010,China
  • Received:2021-12-27 Revised:2022-03-02 Published:2022-08-01 Online:2022-08-01

摘要: 三峡建库后,水库下游河道含沙水流长期处于严重次饱和状态,输沙由相对平衡状态转变为不平衡状态,输沙强度较自然条件下发生显著变化。根据三峡水库蓄水运用前后(1992—2017年)长江中游主要水文站断面、床沙与水文资料,从输沙率变化、床沙粒径变化、平滩流量等角度研究长江中游河道复式断面输沙强度问题,得出以下结论:三峡水库蓄水运用后,进入下游河道的泥沙大幅度较少,长江中游沿程水文站同流量级输沙率明显减少;床沙粒径沿程出现不同程度的粗化,其中荆江河段粗化最为明显,螺山至武汉河段略有粗化;螺山站和汉口站在自然条件下平滩流量附近输沙强度出现峰值,对应的水流挟沙能力为极大值。

关键词: 水库下游, 复式河槽, 输沙率, 平滩流量, 输沙能力

Abstract: After the construction of the Three Gorges Reservoir (TGR),sediment-containing flow in the downstream channel of the reservoir had been in a severe sub-saturation state for a long time. The sediment transport changed from a relative equilibrium state to an unbalanced state,and the sediment transport intensity varied significantly compared with that in natural condition. Based on the cross sectional data,bed sediment and hydrological data of major hydrological stations in the midstream of the Yangtze River before and after the operation of the TGR (1992-2017),we looked into the sediment transport intensity of compound cross sections from the perspectives of sediment transport rate,bed sediment particle size,and bankfull discharge. We found that after the impoundment operation of TGR,the sediment that enters the downstream channels reduced remarkably,and the sediment transport rate of the same flow level at hydrologic stations along the midstream of Yangtze River decreased obviously. The bed sediment was coarsened in different degrees along the river. Such coarsening was most obvious in the Jingjiang reach and less obvious in the Luoshan-Wuhan reach. At hydrologic stations of Luoshan and Hankou,the sediment transport intensity in the adjacent of bankfull discharge reached the maximum under natural conditions,and the corresponding sediment carrying capacity reached peak.

Key words: downstream of reservoir, compound channels, sediment transport rate, bankfull discharge, sediment transport capacity

中图分类号: