锦屏一级水电站左岸抗力体爆破开挖振动监测总结

占学军,吴从清,雷吉飞,郑元福

长江科学院院报 ›› 2014, Vol. 31 ›› Issue (11) : 189-194.

PDF(1211 KB)
PDF(1211 KB)
长江科学院院报 ›› 2014, Vol. 31 ›› Issue (11) : 189-194. DOI: 10.3969/j.issn.1001-5485.2014.11.0362014,31(11):189-194
工程设计与施工监控

锦屏一级水电站左岸抗力体爆破开挖振动监测总结

  • 占学军,吴从清,雷吉飞,郑元福
作者信息 +

Summary on the Monitoring of Vibration Caused by Blasting Excavation of Force-resisting Mass on the Left Bank of Jinping First Stage Hydropower Project

  • ZHAN Xue-jun, WU Cong-qing, LEI Ji-fei, ZHENG Yuan-fu
Author information +
文章历史 +

摘要

根据锦屏一级水电站左岸抗力体处理开挖的特点,在实测质点振动速度和宏观调查等手段的基础上,提出了爆破对排水洞、帷幕洞、置换洞、置换斜井影响沿其振动最大方向振动传播规律的经验公式,以及保证爆破对相邻洞新浇混凝土的影响满足要求的措施。实验结果表明,坝基排水洞的振动控制是重点,最大单段药量以及掏槽孔轴向与洞轴向夹角适当,并在合理安排相关部位开挖与支护时段的情况下,就可以满足相应的安全控制标准,但为安全起见,仍应从严控制最大单段药量。此外,还对爆破振动的控制以及影响振动峰值大小的因素等进行了进一步的分析,可供类似工程开挖参考。

Abstract

On the basis of measuring particle vibration velocity and macroscopic investigation of the force-resisting mass on the left bank of Jinping first stage hydropower project, we proposed the empirical formula of vibration spread regularity and the measures of controlling blasting vibration of the adjacent tunnel’s newly casted concrete. Testing results show that vibration control for the drainage hole of dam foundation is crucial. If the maximum explosive quantity of single shot as well as the angle included between cut hole’s axial direction and tunnel’s axial direction are suitable, and if the excavation and supporting time is rationally arranged, the safety controlling standard can be met. But for the sake of safety, the maximum explosive quantity of single shot should be strictly controlled. Furthermore, blasting vibration control and factors affecting the peak vibration velocity are analyzed. This research is a reference for similar engineering excavation.

关键词

抗力体 / 爆破开挖 / 振动监测 / 锦屏一级水电站

Key words

force-resisting mass / blasting excavation / vibration monitoring / Jinping first stage hydropower project

引用本文

导出引用
占学军,吴从清,雷吉飞,郑元福. 锦屏一级水电站左岸抗力体爆破开挖振动监测总结[J]. 长江科学院院报. 2014, 31(11): 189-194 https://doi.org/10.3969/j.issn.1001-5485.2014.11.0362014,31(11):189-194
ZHAN Xue-jun, WU Cong-qing, LEI Ji-fei, ZHENG Yuan-fu. Summary on the Monitoring of Vibration Caused by Blasting Excavation of Force-resisting Mass on the Left Bank of Jinping First Stage Hydropower Project[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(11): 189-194 https://doi.org/10.3969/j.issn.1001-5485.2014.11.0362014,31(11):189-194
中图分类号: TV554.1   

参考文献

[1] 吴火兵,刘学鹏,向学武,等. 锦屏水电站左岸抗力体湿磨细水泥固结灌浆试验 . 云南水力发电,2012,28(6):104-106. (WU Huo-bing, LIU Xue-peng, XIANG Xue-wu, et al. Grouting Test on the Wet and Fine Grinding Cement of Force-resisting Mass in the Left Bank of Jingping Hydropower Project . Yunnan Water Power,2012,28(6) :104-106. (in Chinese))
[2] 杨付贵. 锦屏一级水电站左岸抗力体开挖与支护施工 .中国高新技术企业,2010,(7):156-158. (YANG Fu-gui. Excavation and Supporting for the Force-resisting Mass in the Left Bank of Jinping First Stage Hydropower Project. Chinese High-tech Enterprises,2010,(7):156-158. (in Chinese))
[3] 杨剑锋,蒯圣堂,曹红艳.锦屏一级与小湾电站坝肩抗力体灌浆比较分析. 人民长江,2009,40(18):42-44. (YANG Jian-feng, KUAI Sheng-tang, CAO Hong-yan. Comparative Analysis of Grouting for Left Body Resistant Body of Jinping Dam and That of Xiaowan Hydropower Station .Yangtze River, 2009,40(18):42-44. (in Chinese))
[4] 张正宇,张文煊,吴新霞,等. 现代水利水电工程爆破. 北京:中国水利水电出版社,2003. (ZHANG Zheng-yu, ZHANG Wen-xuan, WU Xin-xia,et al. Modern Hydraulic and Hydro-power Engineering Blasting . Beijing: China Water Power Press, 2003. (in Chinese))
[5] 刘墅辉,何泽山. 左岸抗力体不良地质带置换平洞开挖支护施工 .人民长江,2009,40(18):42-44. (LIU Shu-hui, HE Ze-shan. Excavation and Supporting Construction of Left Bank Force-resisting Mass’s Defected Geology Band in Substitutive Adit . Yangtze River,2009, 40(18):42-44. (in Chinese))
[6] 杨剑锋, 王国平, 陈芙蓉.左岸抗力体网格置换洞(井)施工监理.人民长江,2009,40(18):66-68.(YANG Jian-feng, WANG Guo-ping, CHEN Fu-rong. Construction Supervision of Left Bank Force-resisting Gridding Substitutive Hole (Well) . Yangtze River, 2009,40(18):66-68. (in Chinese))
[7] 张 迪,赵 颖. 小湾水电站坝肩抗力体爆破试验. 云南水力发电,2009,25(6):20-23.(ZHANG Di, ZHAO Ying. The Dam Abutment Force-resisting Mass Blasting Test in Construction of the Xiaowan Hydropower Project. Yunnan Water Power, 2009, 25(6):20-23.( in Chinese))
[8] 占学军,李秀龙.小湾水电站左右岸抗力体爆破试验与振动测试报告. 武汉:长江科学院,2006.(ZHAN Xue-jun,LI Xiu-long. Report of Blasting Test and Vibration Monitoring on the Force-resisting Mass in the Left and Right Bank of Xiaowan Hydropower Project . Wuhan:Yangtze River Scientific Research Institute, 2006.(in Chinese))
[9] 王 胜,黄润秋,祝华平,锦屏一级水电站左岸抗力体基础处理洞室群围岩稳定性分析. 探矿工程:岩土钻掘工程, 2009, 36(9) : 72-76. (WANG Sheng, HUANG Run-qiu, ZHU Hua-ping. Analysis on Stability of Surrounding Rock of Underground Chamber Group on Left Bank Resisting Rock of Jinping-Ⅰ Hydropower . Exploration Engineering: Rock & Soil Drilling and Tunneling, 2009, 36(9) : 72-76. (in Chinese))
[] 占学军. 锦屏一级水电站左岸基础处理工程爆破试验与振动测试报告. 武汉:长江科学院,2008.(ZHAN Xue-jun. Report of Blasting Test and Vibration Monitoring for the Treatment of Left Bank Foundation of Jingping First Stage Hydropower Project . Wuhan:Yangtze River Scientific Research Institute,2008.(in Chinese))

PDF(1211 KB)

Accesses

Citation

Detail

段落导航
相关文章

/