高水头船闸输水水流携带巨大能量,可能对船闸输水系统运行安全及闸室内船舶停泊安全产生危害,选择合理的输水系统型式对保障工程安全至关重要。随着大型超高水头单级船闸——大藤峡船闸的开工建设,研究发现目前已成功运行的输水系统型式不能满足该工程需要,亟需消能效果更好的输水系统。结合大藤峡船闸工程相关研究,参考国内外已建高水头船闸输水系统布置的成功经验,总结了高水头船闸不同输水系统型式与船闸运行水头和闸室尺度规模的匹配关系,介绍了适应大藤峡船闸工程特点的自分流全闸室出水4区段等惯性输水系统型式,提出了消能效果更好的带内消能工的输水系统新体型,可供类似超高水头大型船闸的设计和研究借鉴。
Abstract
The great stream power in shiplock filling and emptying system with high head may cause harm to the safety of shiplock operation and ship berthing. Choosing a proper type of filling and emptying system will be vital in guaranteeing engineering safety. With the construction of Datengxia shiplock which is a large single lift lock with super-high head, the existing filling and emptying systems cannot meet the shiplock requirement, and a system with better energy dissipation effect is in urgent need. According to relative researches on Datengxia shiplock and successful experiences in the layout patterns of shiplock’s filling and emptying system with high head at home and aboard, we summarize the matching relations between shiplock type and operation head as well as chamber scale, and present a new dynamically balanced system pattern fit for the main features of Datengxia shiplock, with autonomic diversion outlets in the whole chamber at 4 zones. This new type of shiplock filling and emptying system with interior energy dissipation function can provide reference for the design and study of subsequent large shiplocks with super-high head.
关键词
大型超高水头船闸 /
输水系统型式 /
自分流 /
全闸室出水 /
内消能工
Key words
large-scale shiplock with super-high head /
type of filling and emptying system /
autonomic diversion /
whole bottom water filling /
internal energy dissipater
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 江耀祖,吴英卓,徐勤勤,等.三峡船闸关键水力学问题研究[J].湖北水力发电,2007,72(3):60-64.
[2] 蒋筱民,童 迪,吴英卓.乌江银盘船闸输水系统设计与试验研究[J].人民长江, 2008,39(4):77-79.
[3] 吴英卓,陈 建,王智娟,等.高水头船闸输水系统布置及应用[J].长江科学院院报, 2015,32(2):58-63.
[4] 付文周,陈河东.安谷水电站船闸阀门水力学研究[J].水运工程, 2009, (12):165-167.
[5] 交通部科学技术情报研究所.国外过船建筑物(第一辑)[R].北京:交通部科学技术情报研究所,1972.
[6] 杨本新.万安船闸设计与运行实践[J].人民长江,1996,27(11):19-21.
[7] CHAUDA A J, PERKINS L Z. Filling and Emptying System, John Day Lock, Columbia River, Oregon and Washington, Hydraulic Model Investigation[R]. Washington D C:United States Army Corps of Engineers, 1974.
[8]Division Hydraulic Laboratory Bonneville. Filling and Emptying System for Ice Harbor Lock, Snake River, Washington, Hydraulic Model Investigation[R]. Washington D C:United States Army Corps of Engineers, 1973.
[9] 交通部三峡工程航运办公室.国外通航建筑物(第一辑)[R].北京:交通部三峡工程航运办公室,1989.
[10]PERKINS L Z, CHAUDA A J. Filling and Emptying System, Little Goose Lock, Snake River, Washington, Hydraulic Model Investigation[R]. Washington D C: United States Army Corps of Engineers, 1975.
[11]邓廷哲,金 峰,彭爱琳.葛洲坝船闸水力学问题综合分析[J].人民长江,2002,33(2):41-46.
[12]North Pacific Division of United States Army Corps of Engineers. Navigation Lock for Lower Granite Dam, Snake River, Washington, Hydraulic Model Investigations, Report No. TR-126-1[R]. Washington D C: North Pacific Division of United States Army Corps of Engineers, 1979.
[13]易兴华.等惯性输水系统及其在葛洲坝船闸中的应用[J].长江科学院院报,1988,5(1):37-48.
[14]吴英卓,江耀祖.银盘船闸输水系统布置型式研究[J].长江科学院院报, 2008,25(6):6-9.
[15]吴英卓,江耀祖.三峡船闸输水系统分流口型式研究[J].长江科学院院报,1998,15(5):6-11.
[16]邓廷哲.船闸输水廊道阀门段水力学问题的分析研究[J].长江科学院院报,1989,6(2):37-43.
[17]邓廷哲.葛洲坝船闸水力学原、模型试验比较[J].长江科学院院报,1993,10(2):67-72.
[18]吴英卓,江耀祖,黄国兵,等.一种高水头船闸分散输水系统:中国,ZL 2014 1 0089973.7[P].2015-11-18.
[19]李 君,张瑞凯,宣国祥.内消能工在船闸输水系统中的应用分析[J].水利水运工程学报,2008,(3):40-46.