长江科学院院报 ›› 2016, Vol. 33 ›› Issue (2): 123-127.DOI: 10.11988/ckyyb.20140867

• 信息技术应用 • 上一篇    下一篇

二滩水电站监控系统改造几起典型故障分析

席光庆, 周瑜, 李阳阳, 武法磊, 周琪, 周胜伟, 简振远, 宋永恒   

  1. 雅砻江流域水电开发有限公司,成都 610051
  • 收稿日期:2014-10-13 出版日期:2016-02-01 发布日期:2016-02-17
  • 作者简介:席光庆(1983-),男,湖南永州人,工程师,硕士研究生,主要从事大型水电厂计算机监控、综合自动化、通信技术、流域化电力生产管理及项目计划管理等工作,(电话)028-82907464 (电子信箱)xiguangqing@ylhdc.com.cn。

Typical Faults in the Technical Reform of Monitoring and Control System for Ertan Hydropower Plant

XI Guang-qing, ZHOU Yu, LI Yang-yang, WU Fa-lei, ZHOU Qi, ZHOU Sheng-wei, JIAN Zhen-yuan, SONG Yong-heng   

  1. Yalong River Hydropower Development Company, Ltd.,Chengdu 610051,China
  • Received:2014-10-13 Online:2016-02-01 Published:2016-02-17

摘要: 对监控系统技术改造过程中出现的信号误报警、调度通信系统数据通信异常、101规约通信数据刷新慢及AGC/AVC工作站死机4个典型故障进行分析,发现上述问题分别由回路电磁干扰、程序存在bug、流程考虑不周全、固件版本落后及负荷分配计算程序不合理引起。通过下列处理方法故障全部得到解决:加强回路抗干扰能力及在程序中对信号进行滤波,剔除程序bug、合理安排进程启停时间及顺序,优化程序流程及策略以减少发送的数据量、缩短发送队列的长度,升级固件版本、优化负荷分配计算程序以防止AGC/AVC工作站死机。结果表明所采用处理方法是有效的。

关键词: 二滩水电站, 监控系统, 调度通信, AGC/AVC, IEC60870-5-104

Abstract: In the process of technical renovation for the monitoring and control system, there are four typical faults: false alarm signals, abnormal data communication in dispatch communication system, slow data refreshing of the 101 communication protocol and AGC/AVC workstation crash. Through analysis, we found that these faults are caused by circuit electromagnetic interference, software bugs, ill-considered procedures, outdated firmware version and unreasonable allocation in calculation procedures, respectively. We can solve all the faults by strengthening circuit anti-interference ability and filtering signals in the program, removing program bugs , reasonably arranging the start-stop time and orders in processing sequence, optimizing process and strategies to reduce the amount of data sent and shorten the queues length, upgrading the firmware version, and optimizing the load distribution of calculation program to avoid halt of AGC/AVC workstation system. Results show that the measures are effective.

Key words: Ertan hydropower plant, monitoring and control system, dispatch communication system, AGC/AVC, IEC60870-5-104

中图分类号: