[1] 张功育, 汤 健, 王海军. 跌坎式底流消能工消能机理与研究[J]. 南水北调水利与科技, 2005,(6):43-45.(ZHANG Gong-yu,TANG Jian,WANG Hai-jun. Analysis and Research of Energy Dissipation for Falling-sill Bottom-flow[J]. South-to-North Water Transfers and Water Science Technology,2005,(6):43-45.(in Chinese)) [2] 孙永娟, 孙双科. 高水头大单宽底流消能技术研究成果综述[J].水力发电, 2005,(8):70-72.(SUN Yong-juan,SUN Shuang-ke.Summary on Research Results of Underflow Energy Dissipation Technology with High Head and Large Unit-Width Discharge[J]. Water Power, 2005,(8):70-72.(in Chinese)) [3] 丁学琦.大流量高水头水电站泄洪消能设计的探讨[J].西北水电,2009,(6):1-6.(DING Xue-qi. Discussion on Energy Dissipation Design for Hydropower Station at High Head and Large Discharge [J]. Northwest Hydropower, 2009,(6):1-6.(in Chinese)) [4] 刘 昉.挑流泄洪雾化数学模型改进与影响因素分析研究[D] .天津:天津大学,2004. (LIU Fang. The Improvement of Mathematic Model for Atomization Caused by Jet from Flip Bucket and Study on the Affecting Factors[D]. Tianjin: Tianjin University, 2004.(in Chinese)) [5] 向光红,曹去修.乌东德水电站枢纽布置咨询报告[R].武汉:长江勘测规划设计研究院,2005.(XIANG Guang-hong,CAO Qu-xiu. Consulting Report on the Project Layout of Wudongde Power Station[R]. Wuhan: Changjiang Institute of Survey, Planning, Design and Research, 2005.(in Chinese)) [6] 杨智鸿,王 愈.泄洪雾化研究综述[J] .中国水运,2008,(7):153-155.( YANG Zhi-hong,WANG Yu. Advances in Research on Flood Discharge Atomization[J]. China Water Transports,2008,(7):153-155.(in Chinese)) [7] 柴恭纯,陈慧玲. 高坝泄洪雾化问题的研究[J] .山东工业大学学报,1992,(3):29-35.(CHAI Gong-chun,CHEN Hui-ling. Study on Flood Discharge from High Dams[J]. Journal of Shandong Polytechnic University, 1992, (3): 29-35.(in Chinese)) [8] 周 辉,黄国兵,王才欢.清江水布垭水利枢纽溢洪道泄洪雾化模型试验研究报告[R] . 武汉:长江科学院,2002.(ZHOU Hui,HUANG Guo-bing,WANG Cai-huan. Model Test Research on Flood Discharge Atomization of the Spillway of Shuibuya Hydroproject[R]. Wuhan: Yangtze River Scientific Research Institute, 2002.(in Chinese)) [9] 柳海涛,孙双科.泄洪雾化预测的人工神经网络方法探讨[J] .水利学报,2005,(10):1-7.(LIU Hai-tao,SUN Shuang-ke. Atomization Prediction Based on Artificial Neural Networks for Flood Releasing of High Dams[J]. Journal of Hydraulic Engineering, 2005,(10):1-7.(in Chinese)) [10]王 颖,李志远,李池清.白山水电站泄洪溅水雾化与防护工程研究[J] .水利水电技术,2008,(6):113-116.(WANG Ying,LI Zhi-yuan,LI Chi-qing. Study on Discharge Splashing Atomization and Protection Works for Baishan Hydropower Station[J]. Water Resources and Hydropower Engineering, 2008,(6): 113-116.(in Chinese)) [11]李 瓒.龙羊峡水电站挑流水雾诱发滑坡问题[J] .大坝与安全,2001,(3):17-20.(LI Zan. On Landslide Induced by Water-Fog from Ski-jump Energy Dissipation of Longyangxia Hydropower Station[J]. Dam and Safety, 2001,(3): 17-20.(in Chinese)) [12]张云芳.拉西瓦水电站泄洪雾化影响范围研究[D] . 天津:天津大学, 2002.(ZHANG Yun-fang. Scope Affected by Flood Discharge Atomization of Laxiwa Hydropower Station[D]. Tianjin :Tianjin University, 2002.(in Chinese)) [13]练继建.高坝泄洪安全关键技术研究[J] .水利水电技术,2009,(8):80-88.(LIAN Ji-jian. Key Technologies for Safety of High Dam Flood Discharge[J]. Water Resources and Hydropower Engineering, 2009,(8):80-88.(in Chinese)) [14]林 云.BP神经网络预测挑流泄洪雾化范围的应用分析[J] .水利科技与经济, 2009,(6) :521-522.(LIN Yun. Analysis of the Application of BP Neural Network on Forecast of the Range of Atomized Flow by Jet from Flip Bucket [J]. Water Conservancy Science and Technology and Ecology, 2009, (6): 521-522. (in Chinese)) [15]吴修峰,吴时强.湾塘水电站泄洪雾化原型观测[J] .水利水运工程学报,2001,(12):71-74.(WU Xiu-feng,WU Shi-qiang. Atomization Measurement for Wantang Hydropower Station [J]. Hydro-science and Engineering, 2001,(12):71-74.(in Chinese)) [16]何思聪.高坝泄洪雾化研究综述[J].现代商贸工业,2012, (7):180-181.(HE Si-cong. Research on High Dam Flood Discharge Atomization[J]. Modern Business Trade Industry, 2012, (7): 180-181.(in Chinese)) [17]向光红,李 伟,王才欢.清江水布垭水电站泄洪雾化影响分析及防护措施研究[R] . 武汉:长江勘测规划设计研究院, 2004.(XIANG Guang-hong, LI Wei, WANG Cai-huan. Effects Analysis and Protecting Measure of Flood Discharge Atomization on Shuibuya Hydropower Project[R]. Wuhan: Changjiang Institute of Survey, Planning, Design and Research, 2004.(in Chinese)) [18]肖兴斌. 高坝挑射水流雾化研究综述[J].长江水利教育,1997,(1):69-72.(XIAO Xing-bin. Summarization of Flood Discharge Atomization on High Dam[J]. Yangtze River Water Science, 1997, (1): 69-72.(in Chinese)) [19]刘宣烈,安 刚,姚仲达.泄洪雾化机理及影响范围探讨[ J].天津大学学报,1991,(9):30-36.(LIU Xuan-lie, AN Gang, YAO Zhong-da. The Investigation on the Mechanism and Sphere of Influence of Atomization by Discharge Flow[J]. Journal of Tianjin University, 1991, (9):30-36.(in Chinese)) [20]黄国情, 吴时强 , 陈惠玲.高坝泄洪雾化模型试验研究[J].水利水运工程学报,2008,(4): 91-94.(HUANG Guo-qing, WU Shi-qiang, CHEN Hui-ling. Model Test Studies of Atomized Flow for High Dams [J].Hydro-Science and Engineering, 2008, (4):91-94.(in Chinese)) [21]陈 端,金 峰,李 静.高坝泄洪雾化降雨强度模型律研究[J].水利水电技术,2005,(10):47-49.(CHEN Duan, JIN Feng, LI Jing. Study on Model Law for Rainfall Intensity of Flood Discharge Atomization of High Dams[J]. Water Resources and Hydropower Engineering, 2005,(10):47-49.(in Chinese)) [22]陈 端.高坝泄洪雾化雨强模型律研究[D].武汉:长江科学院, 2008.(CHEN Duan. Model Law Research on Rainfall Intensity in Spray Atomization Caused by Flow Discharge[D] .Wuhan: Yangtze River Scientific Research Institute, 2008.(in Chinese)) [23]陈维霞.鲁布革电站泄洪建筑物雾化原型观测[J].云南水利发电,1996,(4):31-36.(CHEN Wei-xia. Prototype Observation on Flood Discharge Atomization[J]. Yunnan Water Power, 1996, (4):31-36.(in Chinese)) [24]陈慧玲.乌江东风水电站水力学原型观测——泄洪雾化观测报告[R].南京:南京水利水电研究院,1997.(CHEN Hui-ling. Hydraulic Prototype Observation on Wujiang Dongfeng Hydropower Station: Report on Flood Discharge Atomization[R]. Nanjing: Nanjing Water Resource Hydropower Research Institute, 1997.(in Chinese)) [25]宋恩来.白山水电站泄洪“雾化”和溅水研究[J].东北电力技术,2002,(8):9-13.(SONG En-lai. Research on the Leakage Flow “Atomizer” and Sputter of Baishan Hydropower Station[J]. Power Technology of Northeast, 2002, (8):9-13.(in Chinese)) [26]王环玲,徐伟亚.高坝泄洪雾雨的强度和分布范围研究进展[J].三峡大学学报,2010,(5):1-5.(WANG Huan-ling, XU Wei-ya. Advance on Research of Rainfall Intensity of Flood Discharge Atomization and Distribution Scope of Atomized Flow [J]. Journal of China Three Gorges University, 2010,(5):1-5.(in Chinese)) [27]孔彩粉,廖忠刚,耿 莉.小浪底工程泄洪雾化影响及其防护[J].华北水利水电学院学报,1999,(2): 18-20.(KONG Cai-fen, LIAO Zhong-gang, GENG Li. Effect and Protection of the Overflow Atomization of Xiaolangdi Project[J]. Journal of North China Institute of Water Conservancy and Hydroelectric Power, 1999,(2):18-20.(in Chinese)) [28]苏建明,李浩然.二滩水电站泄洪雾化对下游边坡的影响[J].水文地质工程地质,2002,(2):22-24.(SU Jian-ming, LI Hao-ran. Effect of Flood Discharge Atomization on Downstream Slope of Ertan Hydropower Station[J]. Hydrogeology and Engineering Geology, 2002,(2):22-24.(in Chinese)) [29]王才欢,金 峰,林珍喜,等.江垭水利枢纽工程大坝水力学原型观测报告[R].武汉:长江科学院,2002.(WANG Cai-huan, JIN Feng, LIN Zhen-xi, et al. Hydraulic Prototype Observation on Jiangya Project[R]. Wuhan: Yangtze River Scientific Research Institute, 2002.(in Chinese)) [30]刘宣烈,刘 钧.三元空中水舌掺气扩散的试验研究[J].水利学报,1989,(11):10-17.(LIU Xuan-lie, LIU Jun. Experimental Study on the Diffusion and Aeration of Three-Dimensional Jet[J]. Journal of Hydraulic Engineering, 1989, (11): 10-17.(in Chinese)) [31]杨朝晖,吴守仁,田 忠.宝珠寺水电站泄洪雾化原型观测[J].水利水电技术,2007,(1):69-73.(YANG Zhao-hui, WU Shou-ren, TIAN Zhong. Prototype Observation of Discharge Atomization at Baozhusi Hydropower Station [J]. Water Resources and Hydropower Engineering, 2007, (1): 69-73.(in Chinese)) [32]陈慧玲.小湾水电站泄洪雾化研究[J].云南水力发电,1998,(4):51-55.(CHEN Hui-ling. Study on Flood Discharge Atomization for Xiaowan Hydropower Station[J]. Yunnan Water Power, 1998, (4):51-55.(in Chinese)) [33]罗福海,李 伟.向光红.水布垭电站泄洪雾化影响分析及防护研究[J].水利水电快报,2009,(11):37-39.(LUO Fu-hai, LI Wei, XIANG Guang-hong. Effect Analysis and Protection Design of Flood Discharging Atomization for Shuibuya Hydropower Project[J]. Express of Water Resources and Hydropower Institute, 2009, (11): 37-39.(in Chinese)) [34]陈 端,金 峰,向光红.构皮滩工程泄洪雾化降雨强度及雾流范围研究[J].长江科学院院报,2008,(1):1-4.(CHEN Duan, JIN Feng, XIANG Guang-hong. Rainfall Intensity and Fog Flow of Flood-Discharge Atomization at Goupitan Project[J]. Journal of Yangtze River Scientific Research Institute, 2008, (1): 1-4.(in Chinese)) [35]陈 端.高坝泄洪雾化降雨强度分布及模型律研究[R].武汉:长江科学院, 2010.(CHEN Duan. Study on Model Law and Distribution of Rainfall Intensity of Flood Discharge Atomization of High Dams[R]. Wuhan: Yangtze River Scientific Research Institute, 2010.(in Chinese)) [36]周 辉,陈慧玲.挑流泄洪雾化降雨的模糊综合评判方法[J].水利水运科学研究,1994,(1):165-170.(ZHOU Hui, CHEN Hui-ling. Method of Fuzzy Synthetic Evaluation for Atomization-Rain of Jet Overflow[J]. Hydro-Science and Engineering, 1994, (1):165-170.(in Chinese)) [37]李渭新,王 韦,许唯临,等,挑流消能雾化范围的预估[J].四川联合大学学报,1999,(6):17-23.(LI Wei-xin, WANG Wei, XU Wei-lin, et al. A Rough Method to Calculate the Range of Atomized Flow Caused by Jet Impact[J]. Journal of Sichuan Union University, 1999, (6):17-23.(in Chinese)) [38]孙双科,刘之平.泄洪雾化降雨的纵向边界估算[J].水利学报,2003,(12):53-58.(SUN Shuang-ke, LIU Zhi-ping. Longitudinal Range of Atomized Flow Formed by Discharge of Spillways and Outlet Works [J]. Journal of Hydraulic Engineering ,2003, (12): 53-58.(in Chinese)) [39]刘士和,梁再潮.深窄峡谷区泄洪雾化及其影响的研究[J].武汉水利电力大学学报,1997,(4):6-9.(LIU Shi-he, LIANG Zai-chao. On Atomizing Problems by Jumping Jet in Hydropower Station at Narrow and Deep Valley[J]. Journal of Wuhan University of Hydraulic Electric Engineering, 1997, (4): 6-9.(in Chinese)) [40]刘海涛,孙双科,刘之平.水舌入水喷溅的随机数学模型[J].水利水电科技进展,2009,(6):1-4.(LIU Hai-tao, SUN Shuang-ke, LIU Zhi-ping. A Stochastic Mathematical Model of the Computation of Splashing from Water Jets[J]. Advance in Science and Technology of Water Resources, 2009, (6): 1-4.(in Chinese)) [41]彭新民,林 芝,黄财元.挑流泄洪雾化的人工神经网络模型初探[J].中国农村水利水电,2006,(1):60-61,65.(PENG Xin-min, LIN Zhi, HUANG Cai-yuan. Pre-test on Artificial Neural Network Model of Flood Discharge Atomization[J]. China Rural Water and Discharge, 2006, (1): 60-61,65.(in Chinese)) [42]向光红,江义兰,金 蕾.构皮滩水电站泄洪雾化及防护研究[J].贵州水力发电,2002 ,(2):34-36.(XIANG Guang-hong, JIANG Yi-lan, JIN Lei. Study on the Analysis and Protection of Discharge Atomization at Goupitan Hydropower Station[J]. Guizhou Water Power, 2002 ,(2):34-36.(in Chinese))
( |