It’s been 10 years since the Three Gorges Project (TGP) began to operate in June 2003. The hydrological regime, the channel erosion/deposition, and the river-lake relationship in the river downstream of the project has been changing. The variations of flow and sediment transport, erosion/deposition in the mainstream of middle Yangtze River and in the three flow diversion channels, river regime in the mainstream of middle Yangtze River, as well as river-lake relationship are briefly analyzed. The river-lake evolution in the middle Yangtze River predicted by the Changjiang (Yangtze) River Scientific Research Institute (CRSRI) via physical model tests and mathematical modeling are introduced. Comparison between the model predictions and prototype observations are presented. On this basis, the evolution and regulations of rivers and lakes after the joint operation of reservoirs in the upstream Yangtze River are further discussed. The results provide reference for the strategy, formulation and implementation of regulation measures for rivers and lakes.
LU Jin-you, ZHU Yong-hui
. Issues on Evolution and Regulation of Yangtze River and Lakes Downstream of TGP[J]. Journal of Changjiang River Scientific Research Institute, 2014
, 31(2)
: 98
-107
.
DOI: 10.3969/j.issn.1001-5485.2014.02.020
[1] 许全喜. 三峡工程蓄水运用前后长江中下游干流河道冲淤规律研究[J]. 水力发电学报, 2012, 32(2): 146-154.(XU Quan-xi. Study of Sediment Deposition and Erosion Patterns in the Middle and Downstream Changjiang Mainstream after Impoundment of TGR[J]. Journal of Hydroelectric Engineering, 2013, 32(2): 146-154.(in Chinese))
[2] 长江科学院河流研究所.三峡工程运用后初期荆江河道演变与治理研究[R]. 武汉:长江科学院,2011. (River Department of Yangtze River Scientific Research Institute. Evolution and Regulation of the Jingjiang River in the Early Operation Phase of the Three Gorges Project[R]. Wuhan: Yangtze River Scientific Research Institute, 2011. (in Chinese))
[3] 郭小虎, 渠 庚, 朱勇辉. 三峡工程蓄水运用以来荆江水位流量关系变化分析[J].长江科学院院报, 2011, 28(7): 82-86.(GUO Xiao-hu, QU Geng, ZHU Yong-hui. Changes of the Stage-discharge Relation in Jingjiang River after the Impoundment of Three Gorges Reservoir[J]. Journal of Yangtze River Scientific Research Institute, 2011, 28(7): 82-86. (in Chinese))
[4] 卢金友, 黄 悦, 王 军. 三峡工程蓄水运用后水库泥沙淤积及坝下游河道冲刷分析[J]. 中国工程科学, 2011, 13(7): 129-136. (LU Jin-you, HUANG Yue, WANG Jun. The Analysis on Reservoir Sediment Deposition and Downstream River Channel Scouring after Impoundment and Operation of TGP[J]. Engineering Sciences, 2011, 13(7): 129-136. (in Chinese))
[5] 余文畴, 卢金友. 长江河道演变与治理[M]. 北京:中国水利水电出版社, 2005.(YU Wen-chou, LU Jin-you. Evolution and Regulation of the River Channel of the Yangtze River[M]. Beijing: China Water Power Press, Beijing, 2005. (in Chinese))
[6] 余文畴, 卢金友. 长江河道崩岸与护岸[M]. 北京:中国水利水电出版社, 2008. (YU Wen-chou, LU Jin-you. Bank Collapse and Protection of the Yangtze River[M]. Beijing: China Water Power Press, 2008. (in Chinese))
[7] 潘庆燊, 胡向阳. 长江中下游河道整治研究[M] . 北京:中国水利水电出版社, 2011. (PAN Qing-shen, HU Xiang-yang. Studies on River Regulation of the Middle and Lower Yangtze River[M]. Beijing: China Water Power Press, 2011. (in Chinese))
[8] 长江科学院河流研究所.三峡工程运用后初期上荆江重点河段冲淤变化试验研究[R].武汉:长江科学院, 2009.(River Department of Yangtze River Scientific Research Institute. Physical Modeling of Channel Erosion/Deposition of Key Reach in the Upper Jingjiang River in the Early Operation Phase of the Three Gorges Project[R]. Wuhan: Yangtze River Scientific Research Institute, 2009. (in Chinese))
[9] 卢金友. 三峡工程下游河床冲刷对护岸工程的影响[J]. 人民长江,2002, 33(8):23-25. (LU Jin-you. Influences of Channel Erosion on Bank Protection Works Downstream of the Three Gorges Project[J]. Yangtze River, 2002, 33(8):23-25. (in Chinese))
[10]董耀华, 卢金友, 范北林, 等. 三峡水库运用后荆江典型河段冲淤变化计算分析[J]. 长江科学院院报, 2005, 22(2): 9-12. (DONG Yao-hua, LU Jin-you, FAN Bei-lin, et al. Research on Variations of Typical Lower Jingjiang River Reach after Three Gorges Project Operation[J]. Journal of Yangtze River Scientific Research Institute, 2005, 22(2): 9-12. (in Chinese))
[11]卢金友, 张细兵, 黄 悦. 三峡工程对长江中下游河道演变与岸线利用影响研究[J]. 水电能源科学, 2011, 28(12):61-64. (LU Jin-you, ZHANG Xi-bing, HUANG Yue. Influence of Three Gorges Project on River Evolution and Shoreline Use in Middle and Lower Reaches of Yangtze River[J]. Water Resources and Power, 2011, 28(12):61-64. (in Chinese))
[12]卢金友, 黄 悦. 三峡水库淤积计算预测与原型实测结果比较分析[J]. 长江科学院院报, 2013, 30(12): 1-6. (LU Jin-you, HUANG Yue. Comparison of Sedimentation in Three Gorges Reservoir Between Calculated Prediction and Prototype Measurement[J]. Journal of Yangtze River Scientific Research Institute, 2013, 30(12): 1-6. (in Chinese))
[13]张细兵, 卢金友, 蔺秋生. 长江中下游岸线利用对防洪累积影响初步研究[J]. 长江流域资源与环境, 2011, 20(9):1138-1141. (ZHANG Xi-bing, LU Jin-you, LIN Qiu-sheng. Preliminary Study on Accumulated Influence of the Bankline Use on Flood Control in the Middle and Lower Reaches of the Yangtze River[J]. Resources and Environment in the Yangtze Basin, 2011, 20(9):1138-1141. (in Chinese))
[14]陈肃利, 谢作涛. 长江中下游干流洲滩控制利用思路初步探讨[J]. 人民长江, 2009, 40(13):1-2. (CHEN Su-li, XIE Zuo-tao. Discussion on Beach Land Control and Utilization of the Mainstream of Mid-lower Yangtze River[J]. Yangtze River, 2009, 40(13):1-2. (in Chinese))
[15]卢金友, 张细兵, 姚仕明. 人类活动影响下长江中下游江湖治理问题探讨[J]. 人民长江, 2013, 44(10): 18-22. (LU Jin-you, ZHANG Xi-bing, YAO Shi-ming. Problems of River and Lake Regulation in Middle and Lower Yangtze River under Influence of Human Activity[J]. Yangtze River, 2013, 44(10): 18-22. (in Chinese))
[16]卢金友, 渠 庚, 李发政,等. 下荆江熊家洲至城陵矶河段演变分析与治理思路探讨[J]. 长江科学院院报, 2011, 28(11):113-118. (LU Jin-you, QU Geng, LI Fa-zheng, et al. Channel Evolution of the Reach from Xiongjiazhou to Chenglingji in Lower Jingjiang River and Regulation Considerations[J]. Journal of Yangtze River Scientific Research Institute, 2011, 28(11):113-118. (in Chinese))