[1] 褚明华,黄先龙. 2016年长江中下游崩岸应急整治思考[J].中国水利,2016(21): 10-11,16.
[2] 胡春宏,张双虎. 长江治理开发与保护协调策略探讨[J].人民长江, 2020,51(1): 1-6.
[3] 卢金友,朱勇辉,岳红艳,等. 长江中下游崩岸治理与河道整治技术[J].水利水电快报,2017,38(11):6-14.
[4] 张幸农,应 强,陈长英. 长江中下游崩岸险情类型及预测预防[J].水利学报,2007(增刊1):246-250.
[5] DENG S S, XIA J Q, ZHOU M R, et al. Coupled Modeling of Bed Deformation and Bank Erosion in the Jingjiang Reach of the Middle Yangtze River[J]. Journal of Hydrology, 2019, 568: 221-233.
[6] BEST J. Anthropogenic Stresseson the World's Big Rivers[J]. Nature Geoscience, 2019, 12: 7-21.
[7] XIA J Q, WU B S, WANG Y P, et al. An Analysis of Soil Composition and Mechanical Properties of Riverbanks in a Braided Reach of the Lower Yellow River[J]. Chinese Science Bulletin, 2008, 53(15): 2400.
[8] 王英珍,夏军强,邓珊珊,等. 黄河下游游荡段断面滩岸崩退过程概化模拟[J].水力发电学报,2021,40(3): 39-49.
[9] 夏军强,宗全利. 荆江段崩岸机理及数值模拟[M].北京:科学出版社,2015.
[10]HOOKE J M. An Analysis of the Processes of River Bank Erosion[J]. Journal of Hydrology, 1979, 42: 39-62.
[11]OSMAN A M, THORNE C R. Riverbank Stability Analysis. I: Theory[J]. Journal of Hydraulic Engineering,1988, 114(2): 134-150.
[12]RINALDI M, NARDI L. Modeling Interactions between Riverbank Hydrology and Mass Failures[J]. Journal of Hydrologic Engineering, 2013, 18(10): 1231-1240.
[13]SIMON A, COLLISON A J. Quantifying the Mechanical and Hydrologic Effects of Riparian Vegetation on Streambank Stability[J]. Earth Surface Processes and Landforms, 2002, 27(5): 527-546.
[14]DARBY S E, ALABYAN A M, DE WIEL M J. Numerical Simulation of Bank Erosion and Channel Migration in Meandering Rivers[J]. Water Resources Research, 2002, 38(9): 1163.
[15]ROUSSEAU Y Y, DE WIEL M J, BIRON P M. Simulating Bank Erosion over an Extended Natural Sinuous River Reach Using a Universal Slope Stability Algorithm Coupled with a Morphodynamic Model[J]. Geomorphology, 2017, 295: 690-704.
[16]假冬冬,陈长英,张幸农,等. 典型窝崩三维数值模拟[J].水科学进展, 2020, 31(3): 385-393.
[17]周建红. 荆江河道险工险段崩岸监测技术与预警方法探讨[J].水利水电快报, 2017, 38(12): 12-16.
[18]冯传勇,郑亚慧,周儒夫. 长江中下游崩岸监测技术应用研究[J].水利水电快报, 2018, 39(3): 47-50,52.
[19]刘世振,樊小涛,冯国正,等. 现代高时空分辨率崩岸应急监测技术研究进展与展望[J].长江科学院院报, 2019, 36(10):85-88,93.
[20]马耀昌,刘世振,樊小涛,等. 基于崩岸监测的多波束系统参数设计[J].长江科学院院报,2019,36(10):100-103.
[21]李义天,唐金武,朱玲玲,等.长江中下游河道演变与航道整治[M].北京:科学出版社,2012.
[22]刘东风,吕 平. 安徽省长江崩岸预警技术研究与应用[J].水利水电快报, 2017, 38(11): 91-95,118.
[23]曹 双,蔡 磊,刘 沛. 崩岸预警综合评估法研究与应用探讨[J].水利水电快报, 2019, 40(8): 21-28.
[24]余文畴,卢金友. 长江河道崩岸与护岸[M].北京:中国水利水电出版社, 2008.
[25]钱 宁,张 仁,周志德. 河床演变学[M].北京:科学出版社, 1987.
[26]FUKUOKA S. Erosion Processes of Natural River Bank[C]//Proceedings of the 1st International Symposium on Hydraulic Measurement. Chinese Society of Hydraulic Engineering, Beijing, China. March 24-29, 1980: 222-229.
[27]张幸农,蒋传丰,陈长英,等. 江河崩岸的类型与特征[J].水利水电科技进展, 2008, 28(5):66-70.
[28]蒋泽锋,朱大勇,沈银斌,等. 水流冲刷过程中的边坡临界滑动场及河岸崩塌问题研究[J].岩土力学, 2015, 36(增刊2):21-28.
[29]假冬冬,邵学军,王 虹,等. 荆江典型河湾河势变化三维数值模型[J].水利学报, 2010, 41(12):1451-1460.
[30]KARMAKER T, DUTTA S. Modeling Seepage Erosionand Bank Retreat in a Composite River Bank[J]. Journal of Hydrology, 2013, 476: 178-187.
[31]XIA J Q, ZONG Q L, DENG S S, et al. Seasonal Variations in Composite Riverbank Stability in the Lower Jingjiang Reach, China[J]. Journal of Hydrology, 2014, 519(D): 3664-3673.
[32]余文畴,苏长城. 长江中下游“口袋型”崩窝形成过程及水流结构[J].人民长江, 2007, 38(8):156-159.
[33]余文畴. 长江中下游河道“口袋型”崩窝形成机理初步研究[J].人民长江, 2007, 38(6):40-42.
[34]张幸农,陈长英,假冬冬,等. 流滑型窝崩特征及概化模拟实验[J].水利水运工程学报, 2011(4): 13-16.
[35]张幸农,牛晨曦,假冬冬,等.流滑型窝崩水流结构特征及其变化规律[J].水科学进展,2020,31(1):112-119.
[36]BEGIN Z B. Stream Curvature and Bank Erosion: A Model Based on the Momentum Equation[J]. Journal of Geology, 1981, 89: 497-504.
[37]代加兵,刘宏远,戴海伦,等. 黄河宁蒙河段塌岸侵蚀现场监测及评价研究[J]. 泥沙研究, 2015(5):63-68.
[38]张幸农,蒋传丰,陈长英,等. 江河崩岸的影响因素分析[J].河海大学学报(自然科学版), 2009, 37(1):36-40.
[39]JULIAN J P, TORRES R. Hydraulic Erosion of Cohesive Riverbanks[J]. Geomorphology, 2006, 76(1/2):193-206.
[40]TORREY V H. Retrogressive Failures in Sand Deposits of the Mississippi River. Report 2. Empirical Evidence in Support of the Hypothesized Failure Mechanism and Development of the Levee Safety Flow Slide Monitoring System[R]. Mississippi: US Army Corps of Engineers, 1988.
[41]ARNOLD E, TORAN L. Effects of Bank Vegetation and Incision on Erosion Rates in An Urban Stream[J]. Water, 2018, 10(4): 482.
[42]宗全利,冯 博,蔡杭兵,等. 塔里木河流域河岸植被根系护坡的力学机制[J]. 岩石力学与工程学报,2018, 37(5):329-329.
[43]卢金友等. 长江中下游河道整治理论与技术[M].北京: 科学出版社, 2020.
[44]CLOPPER P E, LAGASSE P F, RUFF J F, et al. NCHRP 568. Riprap Design Criteria, Recommended Specifications, and Quality Control[M]. Washington DC: Transportation Research Board, 2006.
[45]姚仕明,卢金友. 长江中下游护岸工程技术与防护效果研究[C]//纪念'98抗洪十周年学术研讨会优秀文集.郑州:黄河水利出版社, 2008:30-34.
[46]LEOPOLD L B, MADDOCK T. The Hydraulic Geometry of Stream Channels and Some Physiographic Implications[R].Washington DC: U.S. Geological Survey, 1953.
[47]FERGUSON R I. Hydraulics and Hydraulic Geometry[J]. Progress in Physical Geography: Earth and Environment, 1986, 10(1):1-31.
[48]IKEDA S, PARKER G, SAWAI K. Bend Theoryof River Meanders. Part 1. Linear Development[J]. Journal of Fluid Mechanics, 1981, 112: 363-377.
[49]DARBY S E, THORNE C R. Development and Testing of Riverbank-Stability Analysis[J]. Journal of Hydraulic Engineering, 1996, 122(8): 443-454.
[50]DARBY S E, RINALDI M, DAPPORTO S. Coupled Simulations of Fluvial Erosion and Mass Wasting for Cohesive River Banks[J]. Journal of Geophysical Research, 2007, 112(F3): F03022.
[51]RINALDI M, MENGONI B, LUPPI L,et al. Numerical Simulation of Hydrodynamics and Bank Erosion in a River Bend[J]. Water Resources Research, 2008, 44: W09428.
[52]FOX G A,WILSON G V.The Role of Subsurface Flow in Hillslope and Stream Bank Erosion: A Review[J]. Soil Science Society of America Journal,2010,74(3):717-733.
[53]PROSSER I, HUGHES A, RUTHERFURD I. Bank Erosion of an Incised Upland Channel by Subaerial Processes: Tasmania, Australia[J]. Earth Surface Processes and Landforms, 2000, 5(10): 1085-1101.
[54]COUPER P R, MADDOCK I P. Subaerial River Bank Erosion Processesand Their Interaction with Other Bank Erosion Mechanisms on the River Arrow, Warwickshire, UK[J]. Earth Surface Processes and Landforms, 2001, 26: 631-646.
[55]HENSHAW A J,THORNE C R,CLIFFORD N J. Identifying Causes and Controls of River Bank Erosion in a British Upland Catchment[J].Catena,2013,100:107-119.
[56]余明辉,郭 晓. 崩塌体水力输移与塌岸淤床交互影响试验[J].水科学进展, 2014, 25(5): 677-683.
[57]ROSGEN D L. A Practical Method of Computing Streambank Erosion Rate[C]//Proceedings of the Seventh Federal Interagency Sedimentation Conference, Reno, Nevada. March 25-29, 2001, 2(II): 9-15.
[58]LARSEN E W, PREMIER A K, GRECO S E. Cumulative Effective Stream Power and Bank Erosion on the Sacramento River, California, USA[J]. Journal of the American Water Resources Association, 2006, 42(4):1077-1097.
[59]SASS C K, KEANE T D. Application of Rosgen's BANCS Model for NE Kansas and the Development of Predictive Streambank Erosion Curves[J]. Journal of the American Water Resources Association, 2012, 48(4): 774-787.
[60]KWAN H, SWANSON S. Prediction of Annual Streambank Erosion for Sequoia National Forest, California[J]. Journal of the American Water Resources Association, 2014, 50(6):1439-1447.
[61]NEWTON S E, DRENTEN D M. Modifying the Bank Erosion Hazard Index (BEHI) Protocol for Rapid Assessment of Streambank Erosion in Northeastern Ohio[J]. Journal of Visualized Experiments, 2015(96): e52330.
[62]MCMILLAN M, LIEBENS J, METCALF C. Evaluating the BANCS Streambank Erosion Framework on the Northern Gulf of Mexico Coastal Plain[J]. Journal of the American Water Resources Association, 2017, 53(6):1393-1408.
[63]LAURSEN E M. River Width Adjustment II: Modeling[J]. Journal of Hydraulic Engineering, 1998, 124(9):903-917.
[64]WANG G Q, XIA J Q, WU B S. Numerical Simulation of Longitudinal and Lateral Channel Deformations in the Braided Reach[J]. Journal of Hydraulic Engineering, 2008, 134(8):1064-1078.
[65]夏军强,邓珊珊,周美蓉,等.长江中游河道床面冲淤及河岸崩退数学模型研究及其应用[J].科学通报, 2019, 64(7):725-740.
[66]WU W M, VIEIRA D A, WANG S S. One-dimensional Numerical Model for Nonuniform Sediment Transport under Unsteady Flows in Channel Networks[J]. Journal of Hydraulic Engineering, 2004, 130(9): 914-923.
[67]MALEKI, F S, KHAN A A. 1-D Coupled Non-equilibrium Sediment Transport Modeling for Unsteady Flows in the Discontinuous Galerkin Framework[J]. Journal of Hydrodynamics, 2016, 28: 534-543.
[68]王增辉,夏军强,张俊华,等. 考虑干支流倒回灌的小浪底水库异重流模拟[J]. 工程科学与技术, 2018, 50(1): 85-93.
[69]夏军强,王增辉,王英珍,等. 黄河中下游水库-河道-滩区水沙模拟系统的构建与应用[J]. 应用基础与工程科学学报, 2020, 28(3): 652-665.
[70]刘 诚,沈永明. 曲线坐标系下考虑植被影响的三维水沙数学模型[J].水动力学研究与进展A辑, 2011, 26(5): 551-561.
[71]雷文韬,夏军强,谈广鸣. 粘性泥沙冲刷源项公式的改进[J].泥沙研究, 2013(5): 35-40.
[72]胡春宏,王延贵,张燕菁.河流泥沙模拟技术进展与展望[J].水文, 2006, 26(3): 37-41,84.
[73]刘 鑫,夏军强,周美蓉,等.长江中游动床阻力计算及其近期变化特点研究[J].人民长江, 2020, 51(11): 34-40,152.
[74]贺方舟,朱勇辉,郭小虎,等.水库下游悬移质泥沙沿程恢复研究进展[J].长江科学院院报, 2017, 34(12): 1-6.
[75]SIMON A, POLLEN-BANKHEAD N, MAHACEK V,et al. Quantifying Reductions of Mass-failure Frequency and Sediment Loadings from Streambanks Using Toe Protection and Other Means: Lake Tahoe, United States[J]. Journal of the American Water Resources Association, 2009, 45(1): 170-186.
[76]SUTARTO T,PAPANICOLAOU A N,WILSON C G,et al. Stability Analysis of Semicohesive Streambanks with CONCEPTS:Coupling Field and Laboratory Investigations to Quantify the Onset of Fluvial Erosion and Mass Failure[J]. Journal of Hydraulic Engineering,2014,140(9):04014041.
[77]KLAVON K, FOX G A, GUERTAULT L, et al. Evaluating a Process-based Model for Use in Streambank Stabilization: Insights on the Bank Stability and Toe Erosion Model (BSTEM)[J]. Earth Surface Processes and Landforms, 2017, 42(1): 191-213.
[78]假冬冬,邵学军,王 虹,等. 考虑河岸变形的三维水沙数值模拟研究[J].水科学进展, 2009, 20(3): 311-317.
[79]BAUM R L, GODT J W. Early Warning of Rainfall-induced Shallow Landslides and Debris Flows in the USA[J]. Landslides, 2010, 7(3): 259-272.
[80]GOURLEY J J,FLAMIG Z L,VERGARA H,et al.The Flash Project: Improving the Tools for Flash Flood Monitoring and Prediction across the United States[J].Bulletin of the American Meteorological Society,2017,98(2):361-372.
[81]练继建,杨伟超,徐 奎,等. 山洪灾害预警研究进展与展望[J].水力发电学报, 2018, 37(11): 1-14.
[82]邓 宇,赖修蔚,郭 亮. 长江中下游崩岸监测及分析研究[J].人民长江, 2018, 49(15): 13-17.
[83]袁 帅,李志威,朱玲玲,等. 下荆江七弓岭弯道崩岸机理研究[J].泥沙研究, 2020, 45(1): 21-28.
[84]荆州市长江勘察设计院,长江水利委员会长江科学院,荆州市荆江河道演变监测中心. 2017年荆江河道演变监测及分析成果报告[R].荆州: 荆州市长江勘察设计院,2018.
[85]刘东风. 长江河道崩岸预警方法探索[J].江淮水利科技, 2014(4): 5-7.
[86]吴永新,周玲霞,吴 昊,等. 长江南京河段崩岸规律及预警措施[J].水利水电快报, 2017, 38(11): 99-102.