In order to evaluate the in-situ stress field and surrounding rock stability of Kariba Hydropower Plant’s underground powerhouse, we employed multi-factor regression analysis method based on three-dimensional finite element simulation in the regression fitting of measured data so as to obtain the distribution of stress field. The calculated values could well fit the measured values, so the regression results were good. According to regression results, the stress field of underground powerhouse was mainly influenced by horizontal structural stress field and in low stress level due to the effect of topography and geomorphology, formation lithology and fault structure. The direction of maximum horizontal principal stress approximately paralleled to the long axis of the powerhouse, beneficial to the stability of surrounding rock.
ZHANG Xin-hui
,
YIN Jian-min
,
ZHANG Xiang-yang
,
TUO Xing-hua
. Regression Analysis and Evaluation for the In-situ Stress Field of Kariba Hydropower Plant’s Underground Powerhouse[J]. Journal of Changjiang River Scientific Research Institute, 2015
, 32(7)
: 77
-81
.
DOI: 10.3969/j.issn.1001-5485.2015.07.014
[1] 刘允芳. 岩体地应力与工程建设[M]. 武汉:湖北科学技术出版社,2000:1-15. (LIU Yun-fang. Geo-stress in Rock Mass and 3D Construction[M]. Wuhan: Hubei Science and Technology Press, 2000:1-15.(in Chinese))
[2] 蔡美峰. 地应力测量原理和技术[M]. 北京:科学出版社,2000:1-3. (CAI Mei-feng. Principle and Techniques of Geo-stress Measurement[M]. Beijing: Science Press, 2000:1 -3.(in Chinese))
[3] 王金龙. 构造应力场回归分析方法及应用[J]. 新疆石油地质,2007,28(5) :625-627. (WANG Jin-long. Reverse Analysis of Tectonic Stress Field and Its Application[J]. Xinjiang Petroleum Geology, 2007, 28(5) :625-627. (in Chinese))
[4] 李永松,尹健民,刘元坤,等. 阳江抽水蓄能电站地应力场回归分析[J]. 武汉大学学报(工学版),2007,40(4) :69-76. (LI Yong-song, YIN Jian-min, LIU Yuan-kun,et al. Regression Analysis of In-situ Stress Field for Yangjiang Pumped Storage Plant[J]. Engineering Journal of Wuhan University, 2007, 40(4): 69-76. (in Chinese))
[5] 刘允芳, 龚壁新,肖本职, 等. 广州抽水蓄能电站地下厂房区地应力分析研究[J] . 长江科学院院报, 1990,7(3): 45-53. (LIU Yun-fang, GONG Bi-xin, XIAO Ben-zhi, et al. Analyses of Ground Stress Field in Underground Excavation of Guangzhou Pumped Storage Power Station[J]. Journal of Yangtze River Scientific Research Institute, 1990,7(3): 45-53. (in Chinese))
[6] 付成华,汪卫明,陈胜宏. 溪洛渡水电站坝区初始地应力场反演分析研究[J]. 岩石力学与工程学报,2006 ,25(11):2305-2312.(FU Cheng-hua, WANG Wei-ming, CHEN Sheng-hong. Back Analysis Study of Initial Geostress Field of Dam Site for Xiluodu Hydropower Project[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(11): 2305-2312.(in Chinese))
[7] 李青麟.初始应力场的回归与三维拟合[J]. 岩土工程学报,1998, 20(5): 68-71. (LI Qing-lin. Regression Analysis and 3-D Fitting of Initial Stress[J]. Chinese Journal of Geotechnical Engineering,1998,20(5):68-71. (in Chinese))
[8] 张奇华, 钟作武, 龚壁新. 施加边界位移产生纯剪应力及反分析应用[J]. 长江科学院院报, 2000, 17(2): 34-36. (ZHANG Qi-hua, ZHONG Zuo-wu, GONG Bi-xin. Method of Generating Pure Shear Stress by Adding Boundary Displacement and Its Application in Back Analysis for Geostress Field[J]. Journal of Yangtze River Scientific Research Institute, 2000, 17(2): 34-36. (in Chinese))
[9] 卢崇飞,高惠璇, 叶文虎.环境数理统计应用及程序[M] .北京:高等教育出版社,1988:8-41. (LU Chong-fei, GAO Hui-xuan, YE Wen-hu. Application of Mathematical Statistics and Programming Environment[M]. Beijing:Higher Education Press, 1988:8-41. (in Chinese))