Gravel and boulder gabion, which is economical, simple, permeable, flexible, and aesthetic, is widely applied to the blocking, bank protection, and gully stabilization works of water and soil loss control projects in Tibet autonomous region in China. We summarize that when gravel and boulder gabion is applied to retaining walls in various construction projects in Tibet, if the retaining height h≤1.5m, the shape of gravel and boulder gabion’s cross-section can be rectangular, trapezoid, and right trapezoid; while when 1.5m<h<5m, stepped rectangular section can be adopted. Moreover, when gravel and boulder gabion is applied to bank protection and shoal protection works (spur dike and longitudinal dike), stepped trapezoid and trapezoid cross-sections are mostly adopted. The embedded depth of gabion is determined according to erosion depth. When erosion depth is larger than 1.0m, the embedded depth of gabion should be controlled within 1.0m, best around 0.5m. In straight river segments with good foundation and less scouring, the length of longitudinal dike can be partitioned into segments according to the length of gabions per roll; whereas in bending rivers with scouring and non-uniform settlement, the length of longitudinal dike is recommended to be 8-15m. Practice proved that longitudinal dike and spur dike made of gravel and boulder gabions have good resistance to deformation and erosion. They can also work even when the foundation is scoured and collapsed under mountain torrents. After mountain torrents, better effect can be obtained to make up further bank protection project on the basis of the collapsed gabions.
HUANGFU Da-lin,LEI Xiao-hong,HAI Bin,MA Bo
. Application of Gravel and Boulder Gabion in Soil Erosion Control Projects in Tibet[J]. Journal of Changjiang River Scientific Research Institute, 2015
, 32(3)
: 125
-128
.
DOI: 10.3969/j.issn.1001-5485.2015.03.025
[1] 胡甲均. 长江流域水土保持小型水利水保工程设计手册. 武汉: 长江出版社,2006. (HU Jia-jun. Manual of Small Water Conservation Engineering Design in Yangtze River Basin. Wuhan: Yangtze River Press, 2006. (in Chinese))
长江流域水土保持技术手册编辑委员会. 长江流域水土保持技术手册.北京:中国水利水电出版社,1999. (The Editorial Board. Soil and Water Conservation Technical Manual in Yangtze River Basin. Beijing: China Water Power Press,1999.(in Chinese))
陕西省水土保持勘测规划研究所.西藏曲水县茶巴朗水土流失综合治理示范工程初步设计报告.拉萨:西藏自治区水土保持局,2010. (Shannxi Provincial Institute of Soil and Water Conservation Survey and Design. Preliminary Design Report of Soil Erosion Comprehensive Control and Demonstration Project in Qushui County, Tibet. Lhasa: Bureau of Soil and Water Conservation of Tibet Autonomous Region, 2010.(in Chinese))
西藏自治区水土保持局. 西藏拉孜县曲下镇木村综合发展规划报告. 拉萨:西藏自治区水土保持局,2011. (Bureau of Soil and Water Conservation of Tibet Autonomous Region. Comprehensive Development Planning Report of Mu Village, Lazi County, Tibet. Lhasa: Bureau of Soil and Water Conservation of Tibet Autonomous Region, 2011. (in Chinese))