RIVERLAKE SEDIMENTATION AND REGULATION

Study on the Simulation of Sediment in Hydrological Year of Designed Frequency in the Middle-Lower Reaches of Yangtze River after the Three Gorges Project Operation

  • LI Zhen-qing ,
  • WU Chang-hong ,
  • LI Hui-yun ,
  • DU Xiao-yang
Expand
  • 1.River Research Department, Yangtze River Scientific Research Institute, Wuhan 430010, China;
    2.Spatial Information Technology Application Department, Yangtze River Scientific Research Institute, Wuhan 430010,China

Received date: 2013-10-11

  Online published: 2015-02-06

Abstract

The water flow and sediment in Yangtze River have changed remarkably since the operation of Three Gorges Reservoir. To provide guarantee and basis for the simulation of hydrological conditions in sediment model calculation, we statistically analysed the variation of sediment in the middle-lower Yangtze River since the Three Gorges Reservoir impoundment. On this basis, we carried out detailed research on the sediment problem of hydrological year of designed frequency which is often selected in sediment model calculations and tests. We proposed the method and approach of dealing with sandy sediment in sediment model which is to deduce the sediment process of designed flood according to the relationship between flow rate and sediment transport rate. Moreover, in consideration of project safety, we proposed to take the lower enveloping curve of flow rate versus sediment transport rate as the basis of determining sediment process. Through this method, the sediment condition in hydrological year of designed frequency when sediment load decreases could be well reflected.

Cite this article

LI Zhen-qing , WU Chang-hong , LI Hui-yun , DU Xiao-yang . Study on the Simulation of Sediment in Hydrological Year of Designed Frequency in the Middle-Lower Reaches of Yangtze River after the Three Gorges Project Operation[J]. Journal of Changjiang River Scientific Research Institute, 2015 , 32(2) : 11 -13,19 . DOI: 10.3969/j.issn.1001-5485.2015.02.003

References

[1] 董耀华,惠晓晓,蔺秋生.长江干流河道水沙特性与变化趋势初步分分析.长江科学院院报,2008,25(2):16-20.(DONG Yao-hua, HUI Xiao-xiao, LIN Qiu-sheng. Preliminary Analysis on Characteristics and Changing Tendency of Annual Runoff and Sediment Load in Changjiang River Main Channel . Journal of Yangtze River Scientific Research Institute, 2008, 25(2):16-20. (in Chinese))
[2] 胡向阳,张细兵,黄 悦.三峡工程蓄水后长江中下游来水来沙变化规律研究.长江科学院院报, 2010, 27(6): 4-9.(HU Xiang-yang, ZHANG Xi-bing, HUANG Yue. Research on Changes of Coming Sediment and Coming Water of Middle-Lower Yangtze River after TGP Early Operation . Journal of Yangtze River Scientific Research Institute, 2010, 27(6): 4-9. (in Chinese))
[3] 王光谦.河流泥沙研究进展.泥沙研究,2007, (2):64-81.(WANG Guang-qian. Advances in River Sediment Research. Journal of Sediment Research, 2007, (2):64-81.(in Chinese))
[4] COLBY B R. Practical Computation of Bed-Material Discharge. Journal of the Hydraulics Division, ASCE,1964, 90(2): 217-246.
[5] 黄才安,赵晓冬.床沙质与冲泻质划分的新方法.扬州大学学报(自然科学版),2003,6(1):61-65. (HUANG Cai-an, ZHAO Xiao-dong. New Approach to Differentiating Wash Load and Bed Material Load. Journal of Yangzhou University (Natural Science Edition), 2003, 6(1) :61-65.(in Chinese))
[6] 李振青,廖小勇.南京市纬三路长江隧道工程河工模型试验研究报告.武汉:长江科学院,2011. (LI Zhen-qing, LIAO Xiao-yong. Report on the River Model of Tunnel Crossing the Yangtze River at Weisan Road in Nanjing City. Wuhan: Yangtze River Scientific Research Institute, 2011. (in Chinese))

Outlines

/

〈 〉