MONOGRAPH ON THE 30TH ANNIVERSARY OF JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE

Hydraulics Research on the Mid-route of South to North Water Diversion Project

Expand
  • 1.Hydraulics Department, Yangtze River Scientific Research Institute, Wuhan 430010, China;
    2.Key Laboratory of River Regulation and Flood Control of MWR, Yangtze River Scientific Research Institute, Wuhan 430010, China

Received date: 2014-08-18

  Revised date: 2014-10-17

  Online published: 2014-10-20

Abstract

The mid-route of South-to-North Water Diversion Project has many control buildings and complex geological conditions as well as quite different geographical and meteorological conditions along the long line. The design, construction and operation of the project is faced with many technically difficult hydraulics problems. Through decades of research, the Yangtze River Scientific Research Institute has obtained fruitful research results, some of which were applied to the project successfully. In this paper, we expound and summarize several major achievements including canal roughness issues, sluice discharge formula, type of the yellow river crossing tunnel and its hydraulic characteristics, emergency dispatch, and water diversion in winter. It provides technical support for the operation of the middle route and also could be regarded as reference for the design of similar projects.

Cite this article

HUANG Guo-bing, NIE Yan-hua, DUAN Wen-gang . Hydraulics Research on the Mid-route of South to North Water Diversion Project[J]. Journal of Changjiang River Scientific Research Institute, 2014 , 31(10) : 34 -42 . DOI: 10.3969/j.issn.1001-5485.2014.10.006

References

[1] 黄国兵,徐汉珍,韩继斌.陶岔渠首枢纽扩建工程引水闸水力学试验研究[J].长江科学院报,2002,19(增刊):10-13.(HUANG Guo-bing, XU Han-zhen, HAN Ji-bin. Hydraulics Test Research on Diversion Sluice for Extension Project of Taocha Canal Headwork [J]. Journal of Yangtze River Scientific Research Institute,2002, 19(Sup.): 10-13.(in Chinese))
[2] 黄国兵,王才欢.南水北调中线工程陶岔渠首水工整体模型试验研究报告[R].武汉:长江科学院, 2009.(HUANG Guo-bing, WANG Cai-huan. Hydraulic Model Test on Taocha Canal Head of the Middle Route of South to North Water Diversion Project[R] .Wuhan:Yangtze River Scientific Research Institute,2009.(in Chinese))
[3] 段文刚.丹江口大坝加高工程施工度汛期溢流表孔1∶40水工断面模型试验研究报告[R].武汉:长江科学院,2010. (DUAN Wen-gang. The 1:40 Hydraulic Section Model Test of Overflow Spillway of Danjiangkou Dam Heightening Works in Flood Season [R] .Wuhan:Yangtze River Scientific Research Institute,2010.(in Chinese))
[4] 任坤杰,韩继斌.南水北调中线总干渠陶岔渠首枢纽水工整体模型试验研究[R].武汉:长江科学院,2007.(REN Kun-jie, HAN Ji-bin. Hydraulic Model Test Research on Taocha Canal Head of the Middle Route of South to North Water Diversion Project [R] .Wuhan:Yangtze River Scientific Research Institute,2007.(in Chinese))
[5] 曾 祥,黄国兵,段文刚.混凝土渠道糙率调研综述[J].长江科学院院报,1999,16(6):1-4. (ZENG Xiang, HUANG Guo-bin ,DUAN Wen-gang. Summarization of Investigation on Roughness of Concrete Channels [J]. Journal of Yangtze River Scientific Research Institute, 1999,16(6):1-4. (in Chinese))
[6] 段文刚,黄国兵,何 东.混凝土渠道糙率原型观测[J].人民珠江,2001,(5):7-8. (DUAN Wen-gang, HUANG Guo-bin, HE Dong. Prototype Observation on Roughness of Concrete Channels[J]. Pearl River,2001,(5):7-8. (in Chinese))
[7] 侯冬梅,王才欢.南水北调中线一期工程总干渠典型节制闸水流控制与计算研究报告[R].武汉:长江科学院,2009. (HOU Dong- mei, WANG Cai-huan. Typical Sluice Flow Control and Computing Research of the Middle Route of South to North Water Diversion Project [R]. Wuhan: Yangtze River Scientific Research Institute,2009.(in Chinese))
[8] 侯冬梅.调水工程输水渠道堰闸流量计算方法探讨[J].长江科学院院报,2013,30(8): 79-83. (HOU Dong-mei. Discussion on the Calculation Formula of Discharge Flow at Weir Sluice in Water Transfer Project[J]. Journal of Yangtze River Scientific Research Institute, 2013, 30(8): 79-83. (in Chinese))
[9] 段文刚,李 利.南水北调中线穿黄隧洞(可研方案)工程水力学试验研究报告[R].武汉:长江科学院, 2004.( DUAN Wen-gang, LI Li. Hydraulic Model Test Research on Yellow River Tunnel of the Middle Route of South to North Water Diversion Project [R]. Wuhan: Yangtze River Scientific Research Institute,2004.(in Chinese))
[10]黄国兵,王才欢.南水北调中线工程穿黄隧洞水力学试验研究[J].人民长江,1998,(5): 3-5. (HUANG Guo-bing, WANG Cai-huan. Hydraulic Model Test Research on Yellow River Tunnel of the Middle Route of South to North Water Diversion Project [J].Yangtze River,1998,(5): 3-5.(in Chinese))
[11]段文刚,黄国兵,张 晖,等.几种典型水工建筑物进水口消涡措施试验研究[J].长江科学院院报,2011,28(2):21-26. (DUAN Wen-gang, HUANG Guo-bing, ZHANG Hui,et al. Experimental Research on Vortexes Eliminating of Several Typical Hydraulic Intakes[J]. Journal of Yangtze River Scientific Research Institute ,2011,28(2):21-26.(in Chinese))
[12]段文刚,陈 端,黄国兵,等.河道排水倒虹吸进口布置试验研究和设计原则[J].南水北调与水利科技,2009,7(6):369-373.(DUAN Wen-gang, CHEN Duan, HUANG Guo-bin, et al. Test Study and Design Principle for Intake Layout of River Inverted Siphon[J]. Journal of Yangtze River Scientific Research Institute, 2009,7(6):369-373.(in Chinese))
[13]黄国兵,徐勤勤,陈忠儒.南水北调工程主要输水建筑物的水力学研究[J].长江科学院院报,2002,(19):4-7. (HUANG Guo-bing, XU Qin-qin, CHEN Zhong-ru. Hydraulic Research on the Main Water Conveyance Structures of the South to North Water Diversion Project[J]. Journal of Yangtze River Scientific Research Institute, 2002,(19):4-7.(in Chinese))
[14]严 伟,韩继斌,黄国兵.南水北调某干渠倒虹吸工程水力学试验研究[C]∥第三届全国水力学与水利信息学大会,南京,2007:395-400.(YAN Wei, HAN Ji-bin, HUANG Guo-bin. Hydraulic Model Test Research on a Canal Inverted Siphon Project of the South to North Water Diversion Project[C]∥Proceedings of the Hydraulics and Water Conservancy Information Science Conference, Nanjing, 2007:395-400.(in Chinese))
[15]周 赤,黄 薇,何 勇.南水北调中线工程总干渠西赵河倒虹吸水工模型试验研究报告[R].武汉:长江科学院,1995.(ZHOU Chi,HUANG Wei,HE Yong. Hydraulic Model Test Research on Xizhaohe Inverted Siphon of the Middle Route of South to North Water Diversion Project [R] . Wuhan: Yangtze River Scientific Research Institute,1995.(in Chinese))
[16]周 赤,黄 薇.南水北调中线工程河道倒虹吸水力学泥沙模型试验报告(水力学部分)[R].武汉:长江科学院,1997.(ZHOU Chi, HUANG Wei. Hydraulic Sediment Model Test Research on River Inverted Siphon of the Middle Route of South to North Water Diversion Project [R] .Wuhan: Yangtze River Scientific Research Institute,1997.(in Chinese))
[17]薛阿强,李 利. 南水北调中线总干渠陶岔~沙河南段总干渠涵洞式渡槽工程水力学试验研究报告[R].武汉:长江科学院,2006.(XUE A-qiang, LI Li. Hydraulic Model Test Research on Culvert Aqueduct Construction in Taocha-Shahenan Section of the Middle Route of South to North Water Diversion Project[R] .Wuhan: Yangtze River Scientific Research Institute,2006.(in Chinese))
[18]段文刚,王才欢. 南水北调中线总干渠陶岔~沙河南段总干渠河道倒虹吸工程水力学试验研究报告[R].武汉:长江科学院,2006. (DUAN Wen-gang, WANG Cai-huan. Hydraulic Model Test Research on River Inverted Siphon in Taocha-Shahenan Section of the Middle Route of South to North Water Diversion Project[R] .Wuhan: Yangtze River Scientific Research Institute,2006.(in Chinese))
[19]严 伟,韩继斌. 南水北调中线总干渠陶岔~沙河南段总干渠渠道倒虹吸工程水力学试验研究报告[R].武汉:长江科学院,2006.(YAN Wei, HAN Ji-bin. Hydraulic Model Test Research on Canal Inverted Siphon in Taocha-Shahenan Section of the Middle Route of South to North Water Diversion Project[R] .Wuhan: Yangtze River Scientific Research Institute,2006.(in Chinese))
[20]段文刚,陈 端.南水北调中线总干渠陶岔~沙河南段左岸排水倒虹吸进出口布置型式水力学研究报告[R].武汉:长江科学院,2007. (DUAN Wen-gang, CHEN Duan. Hydraulic Model Test Research on Intake of the Left Bank Drainage Inverted Siphon in Taocha-Shahenan Section of the Middle Route of South to North Water Diversion Project[R] .Wuhan: Yangtze River Scientific Research Institute,2007.(in Chinese))
[21]段文刚,王才欢,黄国兵,等.京石段节制闸流量系数原型观测与分析[J].南水北调与水利科技,2009,7(6):186-191. (DUAN Wen-gang, WANG Cai-huan, HUANG Guo-bing, et al. Prototype Observation and Analysis on Discharge Coefficient of Check Gates for Jingshi Section in the Middle Route of South-to-North Water Transfer Project[J]. South-to-North Water Transfers and Water Science & Technology,2009,7(6):186-191. (in Chinese))
[22]段文刚,王才欢.南水北调中线干线京石段应急供水工程临时通水期间水力学测试报告[R].武汉:长江科学院,2008. (DUAN Wen-gang, WANG Cai-huan. Hydraulic Test on Jingshi Section of the Middle Route of South-to-North Water Transfer Project [R]. Wuhan: Yangtze River Scientific Research Institute,2008.(in Chinese))
[23]段文刚,王才欢.南水北调中线一期工程京石段供水调度应急预案研究报告[R].武汉:长江科学院,2009. (DUAN Wen-gang, WANG Cai-huan. Report of Water Supply Emergency Dispatching in Jingshi Section of the Middle Route of South-to-North Water Transfer Project [R]. Wuhan: Yangtze River Scientific Research Institute,2009.(in Chinese))
[24]聂艳华,段文刚.南水北调中线一期工程总干渠供水调度方案研究及编制-应急预案分解及对策[R].武汉:长江科学院,2013. (NIE Yan-hua, DUAN Wen-gang. Report of Water Supply Emergency Dispatching in the Middle Route of South-to-North Water Transfer Project [R]. Wuhan: Yangtze River Scientific Research Institute,2013.(in Chinese))
[25]聂艳华,段文刚.南水北调中线一期工程总干渠应急运行调度规程[R].武汉:长江科学院,2013.(NIE Yan-hua, DUAN Wen-gang. The Emergency Dispatch Procedures of the Middle Route of South-to-North Water Transfer Project [R]. Wuhan: Yangtze River Scientific Research Institute,2013.(in Chinese))
[26]段文刚,黄国兵,韩继斌,等.跨流域调水工程突发事件及应急调度措施研究[J].长江科学院院报,2010,(4):24-27.( DUAN Wen-gang, HUANG Guo-bing, HAN Ji-bin, et al. Study on Sudden Events and Contingency Regulation Measures of Trans-basin Diversion Project[J]. Journal of Yangtze River Scientific Research Institute ,2010,(4):24-27.(in Chinese))
[27]聂艳华,刘 东,黄国兵.国内外大型远程调水工程建设管理经验及启示[J].南水北调与水利科技, 2010,(8):148-151. (NIE Yan-hua, LIU Dong, HUANG Guo-bing. Experience and Inspiration on Construction and Management of Large-Scale & Long-Distance Water Diversion Project at Home and Abroad [J]. South-to-North Water Transfers and Water Science & Technology, 2010,(8):148-151. (in Chinese))
[28]聂艳华,邱本军,黄国兵.引水工程应急调度与风险分析[C]∥水利水电泄水工程与高速水流信息网学术研讨会议,西安,2010: 179-183. (NIE Yan-hua, QIU Ben-jun, HUANG Guo-bing. Emergency Scheduling and Risk Analysis of Water Diversion Project[C]∥ Water Drainage Engineering and High-speed Flow Information Network Academic Research Conference, Xi’an, 2010: 179-183. (in Chinese))
[29]聂艳华,黄国兵,何建国.节制闸控制规则对南水北调中线工程应急调度的影响[J].水电与新能源,2011,(4): 62-65. (NIE Yan-hua, HUANG Guo-bing, HE Jian-guo. Regulator Rules on Emergency Scheduling of the South to North Water Diversion Project[J]. Hydropower and New Energy, 2011,(4): 62-65. (in Chinese))
[30]聂艳华,黄国兵,侯冬梅.分水闸在南水北调中线工程应急调度中的影响[C]∥2011年力学与水利信息学大会,天津,2011: 146-150. (NIE Yan-hua,HUANG Guo-bing,HOU Dong-mei. Distribution Gate Control Rules on Emergency Scheduling of the South to North Water Diversion Project[C]∥Proceedings of the 2011Conference on Hydraulics and Water Conservancy Information Science, Tianjin,2011: 146-150. (in Chinese))
[31]刘孟凯,邢领航,冯晓波.输水渠系应对水污染事故的自动化控制研究[C]∥第十届全国环境与生态水力学学术会议,成都,2012:238-244.(LIU Meng-kai,XING Ling-hang,FENG Xiao-bo. Study on the Automatic Control of Water Pollution Accidents in Conveyance Canal [C]∥Proceedings of the Tenth Academic Conference on Environmental Hydraulic and Eco-hydraulics, Chengdu, 2012:238-244. (in Chinese))
[32]杨金波,段文刚.南水北调中线冰凌观测预报及应急措施关键技术研究[R].武汉:长江科学院, 2013.(YANG Jin-bo,DUAN Wen-gang. Ice Observation and Forecast and Contingency Plans for the Middle Route of the South to North Water Diversion Project [R]. Wuhan: Yangtze River Scientific Research Institute,2013.(in Chinese))
[33]NIE Yan-hua, YANG Jin-bo. Developing of Ice Regime in Water Transfer Canal[C]∥The 35th International Association for Hydro-Environment Engineering and Research (IAHR), Chengdu, Sept 8-13, 2013.
[34]刘孟凯,邢领航,黄明海,等. 长距离渠系融冰期自动化控制模式研究[J].水利学报,2013, (9): 1080-1086. (LIU Meng-kai,XING Ling-hang,HUANG Ming-hai,et al. An Automatic Operation Mode for the Long Distance Canal System in Ice Melting Period[J]. Journal of Hydraulic Engineering,2013, (9): 1080-1086. (in Chinese))
[35]刘孟凯,王长德,冯小波,等.长距离渠系平封冰盖生消自动化控制运行模型[J].水力发电学报,2013,32(3): 93-100. (LIU Meng-kai, WANG Chang-de, FENG Xiao-bo, et al. Mathematical Model for Automatic Operation of Long Distance Canal System with Juxtaposition Ice Cover Formation and Decaying[J].Journal of Hydroelectric Engineering ,2013,32(3): 93-100.(in Chinese))
[36]LIU Meng-kai, FENG Xiao-bo, WANG Chang-de. Operation Method of Long Distance Canal System with Floating Ice Cover[C]∥Proceedings of the 21st IAHR International Symposium on Ice. Dalian, China, June 11-15, 2012: 262-269.
Outlines

/

〈 〉