Ground Pressure Hazard Caused by Insulating Pillar Mining in Dongguashan Copper Mine

  • WANG Ling-hui
Expand
  • Dongguashan Copper Mine, Tongling Nonferrous Metals Group Holding Co., Ltd., Tongling 244031,China

Received date: 2013-03-18

  Revised date: 2014-09-04

  Online published: 2014-09-04

Abstract

The underground pressure hazard in the mining of thick and large ore-body by using panel insulating pillar at Dongguashan copper was analyzed by numerical simulation and microseismic monitoring. Results reveal that rock burst in the mining process is unlikely to occur with very low probability. The volume of each excavation unit should be controlled because displacement and plastic zone increase obviously due to degraded technical condition of mining using insulating pillar. As regards the simulated insulating pillar 54#, the height of excavation space should not exceed 50m, and the length should not be more than 48m. Moreover, interval mining sequence could reduce the stress concentration of engineering rock mass, and is conducive to engineering stability.

Cite this article

WANG Ling-hui . Ground Pressure Hazard Caused by Insulating Pillar Mining in Dongguashan Copper Mine[J]. Journal of Changjiang River Scientific Research Institute, 2014 , 31(9) : 88 -92 . DOI: 10.3969/j.issn.1001-5485.2014.09.017

References

[1] 杨承祥,罗周全,唐礼忠. 基于微震监测技术的深井开采地压活动规律研究[J]. 岩石力学与工程学报,2007,26(4):818-824.(YANG Cheng-xiang, LUO Zhou-quan, TANG Li-zhong. Study on Rule of Geostatic Activity Based on Microseismic Monitoring Technique in Deep Mining[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(4):818-824.(in Chinese))
[2] 赵兴东. 谦比希矿深部开采隔离矿柱稳定性分析[J]. 岩石力学与工程学报,2010,29(增1):2616-2622. (ZHAO Xing-dong. Stability Analysis of Insulating Pillar of Excavation of Chambishi Copper Mine in Depth[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(Sup.1):2616-2622.(in Chinese))
[3] 田显高,陈慧明,陈松树.采空区稳定性的三维有限元模拟[J].矿业研究与开发,2007,27(1):32-34.(TIAN Xian-gao, CHEN Hui-ming, CHEN Song-shu. Three-dimension Finite Element Analysis on Mined-out Area Stability [J]. Mining Research and Development, 2007, 27(1):32-34.(in Chinese))
[4] 罗周全,吴亚斌,刘晓明,等.基于SURPAC的复杂地质体FLAC3D模型生成技术[J].岩土力学,2008,29 (5):1334-1338.(LUO Zhou-quan, WU Ya-bin, LIU Xiao-ming, et al. FLAC3D Modeling for Complex Geologic Body Based on SURPAC[J]. Rock and Soil Mechanics, 2008, 29(5):1334-1338.(in Chinese))
[5] 廖秋林,曾钱帮,刘 彤,等. 基于ANSYS 平台复杂地质体FLAC3D模型的自动生成[J]. 岩石力学与工程学报,2005,24(6):1010-1013. (LIAO Qiu-lin, ZENG Qian-bang, LIU Tong, et al. Automatic Model Generation of Complex Geologic Body with FLAC3D Based on ANSYS Platform[J]. Chinese Journal of Rock Mechanics and Engineering, 2005,24(6):1010-1013.(in Chinese))
[6] 林 杭,曹 平,李江腾,等.基于SURPAC的FLAC3D三维模型自动构建[J].中国矿业大学学报,2008,37(3):339-342.(LIN Hang, CAO Ping, LI Jiang-teng, et al. Automatic Generation of FLAC3D Model Based on SURPAC[J]. Journal of China University of Mining and Technology, 2008,37(3):339-342. (in Chinese))
[7] 汪易森,刘斯宏. 大型地下洞室群开挖的施工预测解析与信息化管理[J].中国工程科学,2007,9(3):35-40.(WANG Yi-sen, LIU Si-hong. Predictive Analysis and Observational Construction for a Large-Scale Underground Powerhouse Cavern Complex[J]. Engineering Science, 2007,9(3):35-40. (in Chinese))
[8] 李冬青,王李管.深井硬岩大规模开采理论与技术-冬瓜山铜矿床开采研究与实践[M].北京:冶金工业出版社,2009. (LI Dong-qing, WANG Li-guan. Theory and Technology of the Massive Mining in Deep Metal Mine: Mining Research and Practice of Dongguashan Copper Mine[M]. Beijing: Metallurgical Industry Press, 2009.(in Chinese))
[9] 唐礼忠,潘长良,谢学斌,等.冬瓜山铜矿深井开采岩爆危险区分析与预测[J]. 中南工业大学学报(自然科学版),2002,33(4):335-338. (TANG Li-zhong, PAN Chang-liang, XIE Xue-bin, et al. Analysis and Prediction of Rock Burst Dangerous areas in Dongguashan Copper Mine under Deep Well Mining[J]. Journal of Central South University of Technology (Natural Science), 2002,33(4):335-338. (in Chinese))
Outlines

/

〈 〉