Abstract

The present research is to explore the seismic response features of the cutoff wall in dam foundation with deep overburden and to evaluate its seismic safety. Jinping rockfill dam was taken a case study. On the basis of 3-dimensional nonlinear static analysis, submodeling method was used to carry out time-history analysis on the foundation’s cutoff wall. The filling materials of dam and the alluvium deposit were simulated by Hardin-Drnevich dynamic constitutive model. The thin-layer contact element was used to simulate the contact relationship between the cutoff wall and the overburden. Results indicated that dynamic stresses showed a strong response in the upper part of the cutoff wall near the bank sides. After superposing the dynamic response with static response, the deformation and stress distribution rules changed slightly compared with those in the static state. Influenced by the terrain of deep and narrow valley and the turning point of the right bank, the vertical compressive stress extremum occurred in the turning point of the right bank of the mid-upper part of the wall instead of the mid-lower part as general rule shows. During the seismic history, the rupture area of the cutoff wall extended little, and the growth rate of vertical compressive stress extremum was only 3.5%. In conclusion, the influence of seismic load on the work condition of cutoff wall was not obvious.

Cite this article

ZHOU Xiao-xi , HE Yun-long , XIONG Kun , PAN Ying . Features of Seismic Response of Cutoff Wall in Dam Foundation with Deep Overburden[J]. Journal of Changjiang River Scientific Research Institute, 2013 , 30(4) : 91 -97 . DOI: 10.3969/j.issn.1001-5485.2013.04.019

References

[1] 牛运光. 国外几项土石坝防渗加固措施简介[J]. 大坝与安全, 1997, (4): 64-69. (NIU Yun-guang. Introduction of Several Measures Abroad for Seepage Control and Reinforcement of Earth-Rockfill Dam[J]. Dam and Safety, 1997, (4): 64-69.(in Chinese))
[2] 沈新慧. 防渗墙及其周围土体的应力探讨[J]. 水利学报, 1995, (11): 39-45.(SHEN Xin-hui. Study on Stresses of Concrete Diaphragm Walls and Surrounding Soil[J]. Journal of Hydraulic Engineering, 1995, (11): 39-45.(in Chinese))
[3] 陈慧远. 土石坝坝基混凝土防渗墙的应力和变形[J]. 水利学报, 1990, (4): 11-21.(CHEN Hui-yuan. Stress-Deformation Analysis of Concrete Diaphragm Wall under Earth-Rockfill Dam[J]. Journal of Hydraulic Engineering, 1990, (4): 11-21.(in Chinese))
[4] DASCAL O. Structural Behaviour of the Manicouagan 3 Cutoff[J]. Canadian Geotechnical Journal, 1979, 16(1): 200-221.
[5] 万 彪, 何蕴龙, 熊 堃. 有厚度节理单元的开发与应用[J].水电能源科学, 2008, 26(4): 63-66.(WAN Biao, HE Yun-long, XIONG Kun. Development of Joint Element with Thickness and Its Application[J]. Water Resources and Power, 2008, 26(4): 63-66.(in Chinese))
[6] BANDIS S C, LUMSDEN A C, BARTON N R. Fundamentals of Rock Joint Deformation[J]. International Journal of Rock Mechanics and Mining Sciences, 1983, 20(6): 249-268.
[7] CLOUGH G W, DUNCAN J M. Finite Element Analysis of Retaining Wall Behavior[J]. Journal of the Soil Mechanics and Foundations Division, ASCE, 1971, 97(12): 1657-1673.
[8] 熊 堃, 何蕴龙, 曹学兴. 观音岩水电站混合坝插入式接头的抗震性能[J]. 天津大学学报, 2010,(7): 583-592.(XIONG Kun, HE Yun-long, CAO Xue-xing. Earthquake-Resistant Characteristics of Inserted Junction in Composite Dam of Guanyinyan Hydropower Station[J]. Journal of Tianjin University, 2010,(7): 583-592.(in Chinese))
[9] 吴秋军, 傅少君. 子模型方法研究瀑布沟土石坝防渗结构[J]. 武汉大学学报(工学版), 2006, 39(3): 55-59.(WU Qiu-jun, FU Shao-jun. Study on Seepage Prevention Structure for Pubugou Earth-rock Dam by Sub-model Method[J]. Engineering Journal of Wuhan University, 2006, 39(3): 55-59.(in Chinese))
[10]赵吉坤, 朱小春, 石端学,等. 子模型法在小湾拱坝结构诱导缝及检查廊道中的应用[J].河海大学学报(自然科学版), 2007, 35(3): 298-301.(ZHAO Ji-kun, ZHU Xiao-chun, DAN Duan-xue, et al. Application of Submodel Method to Inducement Slot and Check-up Porch of Xiaowan Arch Dam[J]. Journal of Hohai University(Natural Sciences), 2007, 35(3): 298-301.(in Chinese))
[11]刘晓青, 李同春, 闫园园,等. 地震作用下混凝土坝孔口应力分析的动力子模型法[J]. 水力发电学报, 2009, (5): 88-91.(LIU Xiao-qing, LI Tong-chun, YAN Yuan-yuan, et al. Dynamic Sub-model Method for Stress Analysis of Orifice in Concrete Dam under Action of Earthquake[J]. Journal of Hydroelectric Engineering, 2009, (5): 88-91.(in Chinese))
[12]DUNCAN J M, CHANG Y C. Nonlinear Analysis of Stress and Strain in Soils[J]. Journal of the Soil Mechanics and Foundations Division, ASCE, 1970, 96(5): 1629-1653.
[13]顾淦臣. 土石坝地震工程[M]. 南京: 河海大学出版社, 1989.(GU Gan-chen. Earthquake Engineering of Earth and Rockfill Dams[M]. Nanjing: Hohai University Press, 1989.(in Chinese))
[14]邱祖林, 陈 杰. 深厚覆盖层上混凝土防渗墙的应力变形特性[J]. 水文地质工程地质, 2006, 33(3): 72-76.(QIU Zu-lin, CHEN Jie. On the Stress and Deformation of Cut-off Wall in the Deep Overburden[J]. Hydrogeology & Engineering Geology, 2006, 33(3): 72-76.(in Chinese))
Outlines

/